Typed states for the displayed outbound observations.
Source: paper_references, paper_reference_links, observed 2026-08-06T05:42:25.802693Z
Paper Citation Record · LEDGER
As of 14 August 2026, this Paper Citation Record lists 52 of 52 outbound references and 0 inbound Pith citation observations for arXiv:2508.01468.
A citation records a reference. It does not transfer a finding from one paper to another.
Typed states for the displayed outbound observations.
Source: paper_references, paper_reference_links, observed 2026-08-06T05:42:25.802693Z
One-hop event checks from named stored sources.
Source: scholarly_work_events, retraction_status_cache, observed 2026-08-13T06:32:02.005865+00:00
Pith citing papers itemized under the disclosed page cap.
Source: paper_references, paper_reference_links
A source-named dated measurement, never combined with another source.
Source: cited_works
52 of 52 outbound references displayed
External citation measurements
No source-named external measurement is stored.
Observation 22019a67-6820-4955-8468-562b2caca6a1 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation , p5), thereby defining the fuzzy mem- bership functions for both the inputs and the out- put
Reference 1
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation c210b50d-f325-4141-90d2-4c5b90ca3e32 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Unresolved cited work
Reference 2
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 78cb5f3d-3bed-4c12-af85-8e48ead9612c · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation low”, “medium
Reference 3
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 81776a81-cd8a-4737-a2bd-ac70dafe19ed · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Unresolved cited work
Reference 4
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 0648a766-beb0-464e-acd0-12894d82a77c · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Unresolved cited work
Reference 5
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 70dce84e-b59f-4a47-bc52-1bd5101c32cc · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Unresolved cited work
Reference 6
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation c4c41a0c-5262-4da2-875b-4e226256821f · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation This pro- cedure reduces the number of rules from 81 to 27, ensuring that the selected rules are the most con- sistent with the benchmark results
Reference 7
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 359fb04d-ea5d-4793-8f63-e540ef638407 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation The result is a time series of emd 2 values
Reference 8
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 444839fd-278b-4e3c-a80b-d39681f56866 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Unresolved cited work
Reference 9
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation dc14f9ff-4cd4-4832-a6a0-b32f9e1cee2a · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation The second is the squared difference between the sum of benchmark hydrogen supply to the HPA and the sum of emd 2
Reference 10
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 1846a7b1-e698-4c50-af99-8bb31512d06c · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation If a stopping criterion is met, repeat steps 2–6 using the parameters calculated by the PSO
Reference 11
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 9ecc8ef5-229e-4a61-a8b7-5c0b731597fa · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Global carbon emissions and decarbonization in 2024
Reference 12
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 2fb1149f-4215-4a99-9c0f-35c4e5a7cd9b · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Ipcc, 2023: Climate change 2023: Synthesis report, sum- mary for policymakers
Reference 13
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 374d2b48-642a-4c32-8881-54f4fd4d4999 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Mitigating climate change
Reference 14
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 87dc6da8-9326-49df-97d0-e09e0970ef9b · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Co 2 emissions in 2022, 2023
Reference 15
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation d19a1fbf-d047-47dd-b55a-f13e7cba6607 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Renewables 2022
Reference 16
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 9c161329-0ae6-46ce-936e-b38b910c07f5 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Re- newable Capacity Statistics 2025, March 2025
Reference 17
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation e8a6d009-9c58-4de5-b3a4-e632f7108178 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Unresolved cited work
Reference 18
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation dcb3aa12-f065-40cd-ab6e-875e9c5135df · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Cost projections for utility-scale battery storage: 2021 up- date
Reference 19
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 965aaf0e-3548-450d-8390-268529986cb4 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation The need for continued innovation in solar, wind, and energy storage
Reference 20
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation f1c2fa42-8c24-463d-b70d-0af3f4b837d4 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Beyond short-duration energy storage
Reference 21
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 2962577a-2e2d-48b8-878c-d978f6ae0245 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Power-to-gas and power-to-x—the history and results of developing a new storage concept
Reference 22
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 05ffc5f1-5b15-4616-bcb2-fd60bd8f3d8b · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation A green hydrogen economy for a renewable en- ergy society
Reference 23
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation f48b52ea-9709-456f-8506-11a11f47247d · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation The future of hydrogen–opportunities and challenges
Reference 24
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation e67b80b7-bf32-4027-8998-e05b2975bb51 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Endogenous learning for green hydrogen in a sector- coupled energy model for europe
Reference 25
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 6781c2e2-2497-4757-b750-0387fdf68e11 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation The potential role of a hydrogen network in europe
Reference 26
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation d1f2fc58-f4e5-47a1-af26-7d1124d2737a · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Over a fifth of all european hydrogen projects stalled or cancelled, 2025
Reference 27
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 58e25ae0-90b3-4600-b9f5-6a3f59cf7faf · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Unresolved cited work
Reference 28
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 96c4019e-bc32-4849-8654-685cf7510963 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Spain’s iberdrola slashes green hydrogen target
Reference 29
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 4d758833-d908-4a4d-b4e6-497c28b15471 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Comment: Bankability and hpas
Reference 30
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 7149e8ee-13aa-4f73-891c-8c5a6cdf4771 · outbound
Reference 31
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 32b628e1-5001-41d2-b89b-14a03acf36e4 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation H2global – idea, instrument & in- tentions
Reference 32
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation ca3b7663-de6a-44bd-9b1b-8ddf0d4b5401 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation A graphical approach to carbon-efficient spot market scheduling for Power-to-X applications
Reference 33
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 14036cff-0783-4f92-a647-b48f7f1131cd · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Cost and co2 emissions co-optimisation of green hydrogen production in a grid-connected renewable en- ergy system
Reference 34
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 9e74317f-744d-4e76-abf1-664eee5558f5 · outbound
Reference 35
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 61f4e1df-0de3-4393-9263-4827375f975b · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Soliman, Hany M
Reference 36
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 89353d86-34ed-4d86-a08a-87d9749e7b1c · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation A review on applications of fuzzy logic control for refrigeration systems
Reference 37
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation dd01560d-4466-4005-8099-9c92758608dd · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Steering control in electric power steering autonomous vehicle using type-2 fuzzy logic control and pi control
Reference 38
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation d25b1372-8416-4f1f-8006-969760db5d0f · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Beshir, and Zhongxia Zhang
Reference 39
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 42c080b4-6bbc-410e-b927-db38ed721749 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Delegated regulation on Union methodology for RFNBOs
Reference 40
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 74f4bb53-b539-4e18-8893-c7106c5571c3 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Technology Data for Renew- able Fuels, 2024
Reference 41
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 2a35b708-1b03-4099-8af0-43d21386b788 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Hydrogen Compression, 2022
Reference 42
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation c10cd68c-7f10-4349-b4d7-782e0465abfd · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Gurobi Optimizer Reference Manual
Reference 44
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 6f80115f-2b50-4589-b8dd-3646aaa3f28c · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Kinoshita, Jakub Balinski, et al
Reference 45
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation d32928c5-6497-4390-a063-bbd1ef94ad1d · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Unresolved cited work
Reference 46
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 5f6fdddd-447a-4978-972d-e58010c94ad9 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Fuzzy logic with engineering applica- tions
Reference 47
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 01a69857-607c-4dcb-bbdc-97b13f456f8b · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation pyswarm 0.6
Reference 48
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 7845c2ed-3d38-4cf7-bf04-c366a9d7bf25 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Wang and J.M
Reference 49
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation cbc965aa-1a44-4fcf-855f-5c52fced2fdd · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Day-ahead prices
Reference 50
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 8ddc26d5-f905-4ee5-805f-593671975479 · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Using bias-corrected reanalysis to simulate current and future wind power out- put
Reference 51
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation 4c49667b-f268-4f56-8f4e-dfb45bfd4b7c · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Renewables.ninja
Reference 52
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.
Observation b8e70353-b43b-4ff0-8bcd-772069385abc · outbound
Bounded fuzzy logic control for optimal scheduling of green hydrogen production and revenue maximisation Unresolved cited work
Reference 2024
Source-reported events for the cited work
Unavailable: canonical work link unavailable.
No inbound Pith citation observations are available.