The reviewed record of science sign in
Pith

arxiv: 1605.01780 · v1 · pith:2T6VDQHO · submitted 2016-05-05 · physics.ins-det · hep-ex

First results of the new endcap TOF commissioning at BESIII

Reviewed by Pith T0 review T1 audit T2 compute T3 formal T4 kernel pith:2T6VDQHOrecord.jsonopen to challenge →

classification physics.ins-det hep-ex
keywords besiiicommissioningendcapetoffirstresultsbeencarried
0
0 comments X
read the original abstract

The upgrade of the current BESIII Endcap TOF (ETOF) is carried out with the Multi-gap Resistive Plate Chamber (MRPC) technology. The installation of the new ETOF has been finished in October 2015. The first results of the MRPCs commissioning at BESIII are reported in this paper.

This paper has not been read by Pith yet.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.