pith. sign in

Integrity report for A Factory-Floor Deployment Case Study of VLA Pipelines for Industrial Packaging Task: Workflow, Failures, and Lessons

A machine-verified record of the checks Pith has run against this paper: detector runs, findings, signed bundle events, and canonical identifiers.

arXiv:2605.27461 · pith:2026:3P3FJFZ5SEJJRHBHVGTXIRQHBK

0Critical
0Advisory
3Detectors run
2026-06-04Last checked

Paper page arXiv integrity.json bundle.json

Detector runs

ai_meta_artifact skipped v1.0.0 · findings 0 · 2026-06-04 00:35:37.427183+00:00
claim_evidence completed v1.0.0 · findings 0 · 2026-06-01 00:26:59.701442+00:00
cited_work_retraction completed v1.0.0 · findings 0 · 2026-05-28 23:24:08.130356+00:00

Findings

No public integrity findings for this paper.

Signed record

The machine-readable record for this paper lives at /pith/3P3FJFZ5/integrity.json. Pith Number bundles also include signed pith.integrity.v1 events where a Pith Number exists.