Pith. sign in

Paper Citation Record · LEDGER

Unit Commitment with Cost-Oriented Temporal Resolution

As of 13 August 2026, this Paper Citation Record lists 24 of 24 outbound references and 0 inbound Pith citation observations for arXiv:2506.02707.

A citation records a reference. It does not transfer a finding from one paper to another.

pith.paper-citation-record.v1
2506.02707 v1

Coverage vector

measured 24 of 24 reference resolution

Typed states for the displayed outbound observations.

Source: paper_references, paper_reference_links, observed 2026-08-07T11:24:19.317278Z

measured 24 of 24 standing notices

One-hop event checks from named stored sources.

Source: scholarly_work_events, retraction_status_cache, observed 2026-08-13T06:32:02.005865+00:00

measured 0 of 0 inbound itemization

Pith citing papers itemized under the disclosed page cap.

Source: paper_references, paper_reference_links

measured 0 of 1 external citation measurements

A source-named dated measurement, never combined with another source.

Source: cited_works

Reference resolution

24 of 24 outbound references displayed

  • verified exact0
  • verified fuzzy24
  • unresolved0
  • parse uncertain0
  • malformed identifier0
  • metadata mismatch0

External citation measurements

No source-named external measurement is stored.

Outbound references

Observation b1dc3c6f-8a2b-45b9-b22e-c3605e09debc · outbound

This paper cites Unit commitment -a bibliographical survey,.

Unit Commitment with Cost-Oriented Temporal Resolution Unit commitment -a bibliographical survey,

Reference 1

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:22.667442Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:17.112580Z digest=sha256:49c29e25723935120cf0e284ebb685f767196172145209a4f499c55860270ec5

Observation 86addfb7-5db1-4539-83af-dc0dae5e25d2 · outbound

This paper cites Stochastic optimization for unit com- mitment—A review,.

Unit Commitment with Cost-Oriented Temporal Resolution Stochastic optimization for unit com- mitment—A review,

Reference 2

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:22.378723Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:17.223544Z digest=sha256:fdec676af0c321c26fdef9161373ec4b221110fbb0ead8d8faf12ef5b0813fa3

Observation 8161f209-a5dc-40f6-9514-f8d1cee5d329 · outbound

This paper cites Time -adaptive unit commitment,.

Unit Commitment with Cost-Oriented Temporal Resolution Time -adaptive unit commitment,

Reference 3

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:22.244752Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:17.308954Z digest=sha256:1cf556ce5468cc8b79d29c7ceef214ed8c189e47fe8e870f663cee3c275da94d

Observation 8b89d9ac-dc06-4239-a575-933317160c59 · outbound

This paper cites Evaluating the impact of sub-hourly unit commitment method on spinning reserve in presence of intermittent generators,.

Unit Commitment with Cost-Oriented Temporal Resolution Evaluating the impact of sub-hourly unit commitment method on spinning reserve in presence of intermittent generators,

Reference 4

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:22.135188Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:17.403101Z digest=sha256:dcf3b4b6fea1bd4d47b4c84520a0477f23c37c41c30abb762bbd91616af9ac0b

Observation 2e6c5f6b-5c39-4c32-94e8-542b2e4b592a · outbound

This paper cites The impact of sub-hourly mod- elling in power systems with significant levels of renewable generation,.

Unit Commitment with Cost-Oriented Temporal Resolution The impact of sub-hourly mod- elling in power systems with significant levels of renewable generation,

Reference 5

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:21.992842Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:17.483269Z digest=sha256:de6af9c5f7b97ac45be991a64eba7b22a70f7aea2655455bcdc1832c8e53f41f

Observation 1e14a3cf-70d1-4d04-b70a-eeda8c4ea190 · outbound

This paper cites A review on time series aggregation methods for energy system models,.

Unit Commitment with Cost-Oriented Temporal Resolution A review on time series aggregation methods for energy system models,

Reference 6

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:21.859126Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:17.538929Z digest=sha256:0f9e71a3e8d695e5b71c8acdebce28a483255524dcabfb20cdda0b487286d701

Observation 45ffaa40-2597-446e-aa01-817ea806a06a · outbound

This paper cites Network -Constrained Unit Com- mitment With Flexible Temporal Resolution,.

Unit Commitment with Cost-Oriented Temporal Resolution Network -Constrained Unit Com- mitment With Flexible Temporal Resolution,

Reference 7

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:21.697772Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:17.677334Z digest=sha256:03df526dfcffcf7fa86637852da7e47c6b06aa9d8eaa19b7313e1e17c0294d44

Observation e4195c7f-1c30-44ee-9b7b-36d8aab399ff · outbound

This paper cites Development of adaptive time patterns for multi-dimensional power system simulations,.

Unit Commitment with Cost-Oriented Temporal Resolution Development of adaptive time patterns for multi-dimensional power system simulations,

Reference 8

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:21.592332Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:17.759414Z digest=sha256:dc4957a4f49e03cf6d0fa28b6c592317e3a354b04e8428acc4ff3338396ec6f6

Observation 9c372192-f2f0-489e-8d81-03c14f62e4fd · outbound

This paper cites Adaptive time period aggregation for Day - ahead unit commitment,.

Unit Commitment with Cost-Oriented Temporal Resolution Adaptive time period aggregation for Day - ahead unit commitment,

Reference 9

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:21.481919Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:17.833693Z digest=sha256:c47002422a48ae07c852749d80a88851b8386fd36e3afb6ff4f68470ddcab984

Observation cd5f0ec7-2084-4215-9189-0b1cfcd1d363 · outbound

This paper cites Load state transition curve based unit commitment for production cost modeling with wind power,.

Unit Commitment with Cost-Oriented Temporal Resolution Load state transition curve based unit commitment for production cost modeling with wind power,

Reference 10

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:21.392178Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:17.869882Z digest=sha256:5ebf30285b9bbf2c6f27b9e824c0af8d4b93ad29806146973b119cfed61a0072

Observation c7287775-88e0-407e-b750-00f8b853bdf6 · outbound

This paper cites An Efficient Method Based on Adaptive Time Resolution for the Unit Commitment Problem,.

Unit Commitment with Cost-Oriented Temporal Resolution An Efficient Method Based on Adaptive Time Resolution for the Unit Commitment Problem,

Reference 11

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:21.280406Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:18.022133Z digest=sha256:2e4a04a246468e5bdc1ca2dd53fc7dc0a22d888be212baa597299e6e6949f837

Observation a748a336-0824-4a2e-bef0-e50840f533d3 · outbound

This paper cites Enhancing economics of power systems through fast unit commitment with high time resolution,.

Unit Commitment with Cost-Oriented Temporal Resolution Enhancing economics of power systems through fast unit commitment with high time resolution,

Reference 12

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:21.165005Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:18.114113Z digest=sha256:3d8eccaefdc18e4802e5080e3f292367e06eb3b76750b6c52342909b42e9df9c

Observation 4de34702-d927-4f34-ab5c-5532d59efd68 · outbound

This paper cites Enhancing power system operational flexibil- ity with flexible ramping products: A review,.

Unit Commitment with Cost-Oriented Temporal Resolution Enhancing power system operational flexibil- ity with flexible ramping products: A review,

Reference 13

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:21.087046Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:18.209210Z digest=sha256:63bc807d2603b4b8f54c3452a9ec2e730e89cb9120640a284e9290e313efe139

Observation 6f229d7e-fe61-4c98-a8cf-3cdf895e5456 · outbound

This paper cites Flexible Ramp Products: A solution to enhance power system flexibility,.

Unit Commitment with Cost-Oriented Temporal Resolution Flexible Ramp Products: A solution to enhance power system flexibility,

Reference 14

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:20.974106Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:18.298029Z digest=sha256:83523bbf7e675d3bf09aaec8e7dcce5500e752b226cce51412e97108957f4503

Observation b9809ca4-dc64-4e82-8f97-be036d94c74d · outbound

This paper cites Flexibility in future power systems with high renewable penetration: A review,.

Unit Commitment with Cost-Oriented Temporal Resolution Flexibility in future power systems with high renewable penetration: A review,

Reference 15

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:20.882579Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:18.403486Z digest=sha256:39462b0d0b56a9c581bd499c9130cea403b3d386aec57d9da630dde95f88d936

Observation 977dbc61-a9e9-42f5-af68-031cbb5c0153 · outbound

This paper cites Renewable energy integration impacts within the context of generator type, penetration level and grid charac- teristics,.

Unit Commitment with Cost-Oriented Temporal Resolution Renewable energy integration impacts within the context of generator type, penetration level and grid charac- teristics,

Reference 16

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:20.789944Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:18.492028Z digest=sha256:cd95267ceabfd4d4688dac8a6568516dbff86c2b6c9f9c011b11573f36bc33b7

Observation 7e20533a-a573-4ee2-83d2-5f867f8b0bcf · outbound

This paper cites Performance -driven time -adaptive stochastic unit commitment based on neural network,.

Unit Commitment with Cost-Oriented Temporal Resolution Performance -driven time -adaptive stochastic unit commitment based on neural network,

Reference 17

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:20.676514Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:18.560631Z digest=sha256:ea90182c8d8884c3988bf1f0b6a452e14272c307cf1a7f7c0c1706d7ac50712d

Observation 70b2d63f-5cf4-433d-92b1-186240843b37 · outbound

This paper cites State -of-the-art in artificial neural network appli- cations: A survey,.

Unit Commitment with Cost-Oriented Temporal Resolution State -of-the-art in artificial neural network appli- cations: A survey,

Reference 18

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:20.552700Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:18.670196Z digest=sha256:822df0cac4b32aedd2de9aeb8aa1a7e59b6e86b2892ae2f57d490d9139608c37

Observation 8dd87bdf-3e82-4dfb-a6d0-c5c3b69e7465 · outbound

This paper cites Start -up costs of thermal pow- er plants in markets with increasing shares of variable renewable genera- tion,.

Unit Commitment with Cost-Oriented Temporal Resolution Start -up costs of thermal pow- er plants in markets with increasing shares of variable renewable genera- tion,

Reference 19

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:20.406263Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:18.790373Z digest=sha256:c0103e60d0ec3b09e5b5b61e262b725877a0443dc45c8c922f6bfc6a7a3925d1

Observation a7d79c5d-2dab-42a6-a111-ed59adfcac9b · outbound

This paper cites Learning to solve bilevel programs with binary tender,.

Unit Commitment with Cost-Oriented Temporal Resolution Learning to solve bilevel programs with binary tender,

Reference 20

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:20.271455Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:18.939286Z digest=sha256:76a5b9322a682f0be870ff21d5ecf4e8b70b498edc0edaedce0a1a48113f24ae

Observation e1506c07-2e5d-47a4-b02c-ec6e5c63d1d6 · outbound

This paper cites Greedy algorithms: a review and open problems,.

Unit Commitment with Cost-Oriented Temporal Resolution Greedy algorithms: a review and open problems,

Reference 21

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:20.121215Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:19.031674Z digest=sha256:f42c061e370024ed134bc7ff4f0d5aa9e03fc703bed64ad2bc3316cec1e9e0ed

Observation 994a038d-038b-4197-bfbb-dc84dcf7264d · outbound

This paper cites An overview of gradient descent optimization algorithms,.

Unit Commitment with Cost-Oriented Temporal Resolution An overview of gradient descent optimization algorithms,

Reference 22

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:19.980679Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:19.115961Z digest=sha256:56fe8b7969898ae0b0cbf63ee0cfa2213bd2eb40a442aa0ed34170fcc1768f8f

Observation bee5c888-8757-490c-a1b5-710f96a52d12 · outbound

This paper cites Generation and consumption | ESIOS electricity data transparency,.

Unit Commitment with Cost-Oriented Temporal Resolution Generation and consumption | ESIOS electricity data transparency,

Reference 23

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:19.734289Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:19.200832Z digest=sha256:1cbe7fda7803268e1aae0671ae746fb33e4131f730657afdc5e34899c6dc3263

Observation f5514e4e-145a-4c0d-bf9d-615869dcd644 · outbound

This paper cites Decision -oriented learning for future power system deci- sion-making under uncertainty,.

Unit Commitment with Cost-Oriented Temporal Resolution Decision -oriented learning for future power system deci- sion-making under uncertainty,

Reference 24

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T11:24:19.517872Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.

source=pdf_text observed=2026-08-07T11:24:19.317278Z digest=sha256:fddd39bb7e38376c4ca809ea1222866f05d3f15ae4523d3f11a0d36afa3a210c

Pith citing papers

No inbound Pith citation observations are available.