pith. sign in

arxiv: 1706.02202 · v1 · pith:A4ED723Mnew · submitted 2017-06-07 · 💻 cs.DS · cs.CC

Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor

classification 💻 cs.DS cs.CC
keywords problemsub-taskstimecompatibilityconstraintscoupleddatagraph
0
0 comments X
read the original abstract

The problem presented in this paper is a generalization of the usual coupled-tasks scheduling problem in presence of compatibility constraints. The reason behind this study is the data acquisition problem for a submarine torpedo. We investigate a particular configuration for coupled tasks (any task is divided into two sub-tasks separated by an idle time), in which the idle time of a coupled task is equal to the sum of durations of its two sub-tasks. We prove -completeness of the minimization of the schedule length, we show that finding a solution to our problem amounts to solving a graph problem, which in itself is close to the minimum-disjoint-path cover (min-DCP) problem. We design a (3a+2b)/(2a+2b)-approximation, where a and b (the processing time of the two sub-tasks) are two input data such as a>b>0, and that leads to a ratio between 3/2 and 5/4. Using a polynomial-time algorithm developed for some class of graph of min-DCP, we show that the ratio decreases to 1.37 .

This paper has not been read by Pith yet.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.