Pith. sign in

REVIEW

Time evolution of ground motion-dependent depolarisation at linear colliders

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 1108.6275 v1 pith:BAI67ISC submitted 2011-08-31 physics.acc-ph

classification physics.acc-ph
keywords depolarisationlinearcollidergroundspintrackingbeamscolliders
verification ladder T0 review T1 audit T2 compute T3 formal

Signed reviews

No signed human review yet.

0 comments
read the original abstract

Future linear colliders plan to collide polarised beams and the planned physics reach requires knowledge of the state of polarisation as precisely as possible. The polarised beams can undergo depolarisation due to various mechanisms. In order to quantify the uncertainty due to depolarisation, spin tracking simulations in the International Linear Collider (ILC) Beam Delivery System (BDS) and at the Interaction Point (IP) have been performed. Spin tracking in the BDS was achieved using the BMAD subroutine library, and the CAIN program was used to do spin tracking through the beam-beam collision. Assuming initially aligned beamline elements in the BDS, a ground motion model was applied to obtain realistic random misalignments over various time scales. Depolarisation at the level of 0.1% occurs within a day of ground motion at a noisy site. Depolarisation at the IP also exceeds 0.1% for the nominal parameter sets for both the ILC and for the Compact Linear Collider (CLIC). Theoretical work is underway to include radiative corrections in the depolarisation processes and simulation of the depolarisation through the entire collider is envisaged.

Discussion (0). Continue with ORCID to comment.

Pith tools