REVIEW
Space charge dominated momentum spread and compensation strategies in the post-linac section of Proton Improvement Plan-II at Fermilab
Not yet reviewed by Pith; the record is open.
This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.
SPECIMEN: schema-true, not a live event
T0 review · schema-true
One-sentence machine reading of the paper's core claim.
pith:XXXXXXXX · record.json · timestamp
read the original abstract
The upcoming Proton Improvement Plan-II (PIP-II), designated for enhancements to the Fermilab accelerator complex, features a new 800 MeV superconducting linac and a Beam Transfer Line (BTL) to transport the beam to the existing Booster synchrotron. To mitigate the space charge tune shift associated with a high intensity accumulated beam, the low emittance linac beam is used to paint the ring phase space both transversely and longitudinally. To prevent losses caused by particles injected outside the rf separatrix while painting longitudinal phase space, the momentum spread of the incoming beam should not exceed 2.1 x 10^-4. Detailed simulations showed that due to space charge, the rms momentum spread increases to 4 x 10^-4 while it is transported in the BTL --about twice the allowable limit. In this paper, we outline a mitigation strategy involving a debuncher cavity. We discuss location, operating frequency, and gap voltage under both nominal and perturbed beam conditions, specifically accounting for momentum jitter. The impact of cavity misalignments is also assessed. The paper concludes by recommending an optimized configuration.
Discussion (0). Continue with ORCID to comment.