Pith. sign in

REVIEW 2 cited by

Challenges for FCC-ee Luminosity Monitor Design

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 2107.12837 v1 pith:CVHGNSTN submitted 2021-07-27 physics.ins-det hep-exphysics.acc-ph

classification physics.ins-dethep-exphysics.acc-ph
keywords emphluminositymboxbeamdetectorfcc-eegeometricalmonitors
verification ladder T0 review T1 audit T2 compute T3 formal
0 comments
abstract

For cross section measurements, an accurate knowledge of the integrated luminosity is required. The FCC-ee Z lineshape programme sets the ambitious precision goal of $10^{-4}$ on the \emph{absolute} luminosity measurement and one order of magnitude better on the \emph{relative} measurement between energy-scan points. The luminosity is determined from the rate of small-angle Bhabha scattering, $\mathrm{e^+e^- \to e^+e^-}$, where the final state electrons and positrons are detected in dedicated monitors covering small angles from the outgoing beam directions. The constraints on the luminosity monitors are multiple: \mbox{\emph{i}) they} are placed inside the main detector volume only about 1\,m from the interaction point; \mbox{\emph{ii})} they are centred around the outgoing beam lines and do not satisfy the normal axial detector symmetry; \mbox{\emph{iii})} their coverage is limited by the beam pipe, on the one hand, and the requirement to stay clear of the main detector acceptance, on the other; \mbox{\emph{iv})} the steep angular dependence of the Bhabha scattering process imposes a geometrical precision on the acceptance limits at about 1\,\textmugreek rad, corresponding to geometrical precisions of $\mathcal{O}(1\,\text{\textmugreek m})$; and \mbox{\emph{v})} the very high bunch crossing rate of 50\,MHz during the Z-pole operation calls for fast readout electronics. %Some constraints may be hard to satisfy simultaneously. As an example, the high readout rate may lead to an elevated level of heat dissipation rendering it difficult to maintain the required geometrical stability. Inspired by second-generation LEP luminosity monitors, a proposed ultra-compact solution is based on a sandwich of tungsten-silicon layers. A vigorous R\&D programme is needed in order to ensure that such a solution satisfies the more challenging FCC-ee requirements.

Discussion (0). Continue with ORCID to comment.

Forward citations

Cited by 2 Pith papers

Reviewed papers in the Pith corpus that reference this work. Sorted by Pith novelty score. Full citation record

  1. On the extraction of $\alpha_\textit{em}(m_Z^2)$ at Tera-$Z$

    hep-ph 2025-01 conditional novelty 7.0 of 10

    Forward-region Bhabha ratios at Tera-Z could extract alpha_em(m_Z^2) with a projected statistical sensitivity of about 6e-6, below the current bottleneck.

  2. New Physics contamination to precision luminosity measurements at future $e^+e^-$ colliders

    hep-ph 2025-01 conditional novelty 6.0 of 10

    Heavy new physics four-fermion operators can bias small-angle Bhabha luminosity calibration at future e+e- colliders at the level of the design precision, and luminosity-independent Bhabha asymmetries can constrain th...

Pith tools