Pith. sign in

Paper Integrity Record · LEDGER

Accelerating Industrial Finite Element Simulations of Electric Machines based on Runtime Analysis

As of 23 July 2026, Pith completed 8 of 8 listed checks against arXiv:2607.07514. The completed checks produced 1 public finding within their stated scope.

This is a record of named checks, not a clean-status claim or a paper verdict.

pith.integrity.v1
2607.07514 v1
pith:2026:GUQRZGVM5PWYQHCFDFXGPGHCV3

Coverage vector

completed 8 of 8 listed checks

Counted as completed checks in the claim sentence numerator.

Listed checks

ai_meta_artifact

completed

v1.0.0, observed 2026-07-23 12:57:21.736491+00:00

Scope
Paper body text scanned for literal AI-assistant artifacts.
Completed surface
Checked 1 reference.

doi_title_agreement

completed

v1.0.0, observed 2026-07-20 19:35:19.844078+00:00

Scope
Cited titles compared with titles resolved from their DOI or arXiv identifier.
Completed surface
Checked 9 references.

doi_compliance

completed

v1.0.0, observed 2026-07-16 10:58:38.157160+00:00

Scope
DOI and arXiv identifiers listed in the bibliography checked against named registries.
Completed surface
Checked 9 references. Recorded 1 finding from this run.

claim_evidence

completed

v1.0.0, observed 2026-07-15 13:04:40.403233+00:00

Scope
Recorded paper claims checked for the evidence artifacts they name.
Completed surface
Completed within the stated scope.

shingle_duplication

completed

v0.1.0, observed 2026-07-09 21:54:23.068902+00:00

Scope
Available paper body text compared for identical 40-token sequences under the detector's stated exclusions.
Completed surface
Checked 600 references.

external_links

completed

v1.0.0, observed 2026-07-09 17:37:21.560375+00:00

Scope
External URLs extracted from paper text checked at the stated time.
Completed surface
Checked 2 references.

citation_quote_validity

completed

v0.1.0, observed 2026-07-09 11:57:13.322614+00:00

Scope
Specific factual attributions checked against cited-paper text available in Pith.
Completed surface
Completed within the stated scope.

cited_work_retraction

completed

v1.0.0, observed 2026-07-09 10:18:59.805016+00:00

Scope
Cited references checked for source-reported retractions or expressions of concern.
Completed surface
Checked 9 references.

Observations

Methods and limits

Each listed check names the surface it examined. A skipped, failed, partial, unavailable, not collected, not requested, or withheld check says nothing about what a completed check would have returned.

  • Only checks with status completed enter the claim sentence numerator.
  • Findings appear only from completed checks and only within the scope printed for that check.
  • Severity labels describe one observation row. They do not roll up into a paper judgment.