pith. sign in

Integrity report for Long-term operation of a double phase LAr LEM Time Projection Chamber with a simplified anode and extraction-grid design

A machine-verified record of the checks Pith has run against this paper: detector runs, findings, signed bundle events, and canonical identifiers.

arXiv:1312.6487 · pith:2013:GY76MC2HZBBL7A4I2BDIPBJUCI

0Critical
0Advisory
0Detectors run
Last checked

Paper page arXiv integrity.json bundle.json

Detector runs

Findings

No public integrity findings for this paper.

Signed record

The machine-readable record for this paper lives at /pith/GY76MC2H/integrity.json. Pith Number bundles also include signed pith.integrity.v1 events where a Pith Number exists.