pith. sign in

arxiv: 1202.1550 · v1 · pith:IMJRVE55new · submitted 2012-02-07 · ⚛️ physics.acc-ph

Experiences with the Fermilab HINS 325 MHz RFQ

classification ⚛️ physics.acc-ph
keywords beamexperiencesfermilabfirstacceleratedbuiltcausecommissioned
0
0 comments X
read the original abstract

The Fermilab High Intensity Neutrino Source program has built and commissioned a pulsed 325 MHz RFQ. The RFQ has successfully accelerated a proton beam at the RFQ design RF power. Experiences encountered during RFQ conditioning, including the symptoms and cause of a run-away detuning problem, and the first beam results are first reported.

This paper has not been read by Pith yet.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.