REVIEW 1 cited by
Performance studies of the CMS Strip Tracker before installation
Not yet reviewed by Pith; the record is open.
This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.
SPECIMEN: schema-true, not a live event
T0 review · schema-true
One-sentence machine reading of the paper's core claim.
pith:XXXXXXXX · record.json · timestamp
Signed reviews
read the original abstract
In March 2007 the assembly of the Silicon Strip Tracker was completed at the Tracker Integration Facility at CERN. Nearly 15% of the detector was instrumented using cables, fiber optics, power supplies, and electronics intended for the operation at the LHC. A local chiller was used to circulate the coolant for low temperature operation. In order to understand the efficiency and alignment of the strip tracker modules, a cosmic ray trigger was implemented. From March through July 4.5 million triggers were recorded. This period, referred to as the Sector Test, provided practical experience with the operation of the Tracker, especially safety, data acquisition, power, and cooling systems. This paper describes the performance of the strip system during the Sector Test, which consisted of five distinct periods defined by the coolant temperature. Significant emphasis is placed on comparisons between the data and results from Monte Carlo studies.
Forward citations
Cited by 1 Pith paper
-
Operation and performance of the CMS silicon strip tracker with proton-proton collisions at the CERN LHC
The CMS silicon strip tracker operated stably through Runs 1 and 2, with a readout saturation issue understood and fixed in 2016, and radiation damage models projecting survival to 500 inverse femtobarns.
Discussion (0). Continue with ORCID to comment.