Balancing parallel assembly lines with disabled workers
classification
💻 cs.DM
keywords
assemblybalancinglineparallelproblemdisabledlinesworker
read the original abstract
We study an assembly line balancing problem that occurs in sheltered worker centers for the disabled, where workers with very different characteristics are present. We are interested in the situation in which parallel assembly lines are allowed and name the resulting problem as parallel assembly line worker assignment and balancing problem. We present a linear mixed-integer formulation and a four-stage heuristic algorithm. Computational results with a large set of instances recently proposed in the literature show the advantages of allowing alternative line layouts.
This paper has not been read by Pith yet.
discussion (0)
Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.