Sequencing, task failures, and capacity when failures are driven by a non-homogeneous Poisson process

As of 9 August 2026, this Paper Citation Record lists 16 of 16 outbound references and 0 inbound Pith citation observations for arXiv:2506.06900.

A citation records a reference. It does not transfer a finding from one paper to another.

pith.paper-citation-record.v1
2506.06900 v1

Coverage vector

measured 16 of 16 reference resolution

Typed states for the displayed outbound observations.

Source: paper_references, paper_reference_links, observed 2026-08-07T06:01:59.900138Z

measured 16 of 16 standing notices

One-hop event checks from named stored sources.

Source: scholarly_work_events, retraction_status_cache, observed 2026-08-09T06:31:02.800959+00:00

measured 0 of 0 inbound itemization

Pith citing papers itemized under the disclosed page cap.

Source: paper_references, paper_reference_links

measured 0 of 1 external citation measurements

A source-named dated measurement, never combined with another source.

Source: cited_works

Reference resolution

16 of 16 outbound references displayed

  • verified exact0
  • verified fuzzy16
  • unresolved0
  • parse uncertain0
  • malformed identifier0
  • metadata mismatch0

External citation measurements

No source-named external measurement is stored.

Outbound references

Observation 9c5d4a20-4f01-4727-8cf9-808060847bdc · outbound

This paper cites Rinnooy Kan.

Sequencing, task failures, and capacity when failures are driven by a non-homogeneous Poisson process Rinnooy Kan

Reference 1

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T06:02:00.098608Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.

source=arxiv_source observed=2026-08-07T06:01:59.845987Z digest=sha256:8bbef6ae114296514bd7c57b9e6447d5a17e95dbcb01ef315cc210e3528f2346

Observation 1d34469b-af12-49a6-bd26-c95e5b458b82 · outbound

This paper cites Asymptotic behavior of total times for jobs that must start over if a failure occurs.

Sequencing, task failures, and capacity when failures are driven by a non-homogeneous Poisson process Asymptotic behavior of total times for jobs that must start over if a failure occurs

Reference 2

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T06:02:00.086879Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.

source=arxiv_source observed=2026-08-07T06:01:59.849595Z digest=sha256:24ad99ffafe6f9dca9b856d3a068dd67c492b0d7a56c7f1e4f3575b2f615bab7

Observation c72d1c80-554c-4e74-819a-7811c91fde53 · outbound

This paper cites Sequencing jobs on a non- M arkovian machine with random disruptions.

Sequencing, task failures, and capacity when failures are driven by a non-homogeneous Poisson process Sequencing jobs on a non- M arkovian machine with random disruptions

Reference 3

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T06:02:00.074884Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.

source=arxiv_source observed=2026-08-07T06:01:59.852734Z digest=sha256:93003f2952a792a41c7700f59da17146a7e86b6ac704301e952c2c2c436710c4

Observation 1daa6ad5-fa20-4449-b83e-a92168e84ec9 · outbound

This paper cites A theoretical framework for evaluating mental workload resources in human systems design for manufacturing operations.

Sequencing, task failures, and capacity when failures are driven by a non-homogeneous Poisson process A theoretical framework for evaluating mental workload resources in human systems design for manufacturing operations

Reference 4

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T06:02:00.064633Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.

source=arxiv_source observed=2026-08-07T06:01:59.855756Z digest=sha256:2c81a7c78ce7a26a635234ab2e249edbf774627d961663cbabf5b7fc344cb309

Observation d60b181e-ee28-4151-9018-8e7e9079a599 · outbound

This paper cites Birge, J.B.G.

Sequencing, task failures, and capacity when failures are driven by a non-homogeneous Poisson process Birge, J.B.G

Reference 5

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T06:02:00.053819Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.

source=arxiv_source observed=2026-08-07T06:01:59.859029Z digest=sha256:d8f54108ff97de40f744953fc314fd131b222167ef51f7a6288339e4e4558b00

Observation 8cdfde65-1670-4e9d-86bc-5f3c68c680f4 · outbound

This paper cites Introduction to Stochastic Processes.

Sequencing, task failures, and capacity when failures are driven by a non-homogeneous Poisson process Introduction to Stochastic Processes

Reference 6

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T06:02:00.043075Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.

source=arxiv_source observed=2026-08-07T06:01:59.862899Z digest=sha256:9ba9f5cdc3bc3cade9559ffa1b85484d83d82ec2d84bf69a4bebb27ea549b70f

Observation 4e3f3a90-8b25-4db5-a369-2bf39dec6a3f · outbound

This paper cites Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flow time.

Sequencing, task failures, and capacity when failures are driven by a non-homogeneous Poisson process Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flow time

Reference 7

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T06:02:00.031557Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.

source=arxiv_source observed=2026-08-07T06:01:59.866344Z digest=sha256:1f08f48f5647f454f308fb128e37caa6ee68d52b075ddbd2d41bc5be78f18e13

Observation da59c772-fee6-45f3-9976-e1c0db5da470 · outbound

This paper cites Stochastic scheduling subject to machine breakdowns: The preemptive-repeat model with discounted reward and other criteria.

Sequencing, task failures, and capacity when failures are driven by a non-homogeneous Poisson process Stochastic scheduling subject to machine breakdowns: The preemptive-repeat model with discounted reward and other criteria

Reference 8

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T06:02:00.019804Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.

source=arxiv_source observed=2026-08-07T06:01:59.869336Z digest=sha256:62b7ebd8b0d89ce3acaddd8aa51784b4b33b87da6aa657be0ce76be919c20768

Observation 3013bfcf-4da5-4fc2-a91e-c8df0459a9e0 · outbound

This paper cites A note on stochastic scheduling on a single machine subject to breakdown - the preemptive repeat model.

Sequencing, task failures, and capacity when failures are driven by a non-homogeneous Poisson process A note on stochastic scheduling on a single machine subject to breakdown - the preemptive repeat model

Reference 9

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T06:02:00.008985Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.

source=arxiv_source observed=2026-08-07T06:01:59.872850Z digest=sha256:cfd93df242d871acf4ba8772901a8cf69de62c11aa451ad7c8afbecc4aa3b382

Observation 3e195c78-3d94-4f87-a56a-73b54b85c161 · outbound

This paper cites Minimizing makespan on a single machine subject to random breakdowns.

Sequencing, task failures, and capacity when failures are driven by a non-homogeneous Poisson process Minimizing makespan on a single machine subject to random breakdowns

Reference 10

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T06:01:59.997975Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.

source=arxiv_source observed=2026-08-07T06:01:59.876713Z digest=sha256:523426fd795c3bb56336251837ad2e5b646751d8a6406c45506360b35b6c7be9

Observation 5c78eadf-6e6d-4cf9-8f3a-5cd0a769ec73 · outbound

This paper cites Erratum to `` M inimizing makespan on a single machine subject to random breakdowns''.

Sequencing, task failures, and capacity when failures are driven by a non-homogeneous Poisson process Erratum to `` M inimizing makespan on a single machine subject to random breakdowns''

Reference 11

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T06:01:59.987004Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.

source=arxiv_source observed=2026-08-07T06:01:59.880608Z digest=sha256:3b38070b44cdb787db7f1ba7cd7adadd11b9e0e8fe54b41664871e44011588ff

Observation 5b7146fe-32ff-4e97-96f3-59400cc7bb20 · outbound

This paper cites Pinedo and Sheldon M.

Sequencing, task failures, and capacity when failures are driven by a non-homogeneous Poisson process Pinedo and Sheldon M

Reference 12

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T06:01:59.975257Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.

source=arxiv_source observed=2026-08-07T06:01:59.884355Z digest=sha256:eaf4698800cbdc5fc2b7c25d11ed509b265c9e30244e9b5e145854a785d19a56

Observation 574a5101-7b8c-4cce-b5e1-dbdf65a87e54 · outbound

This paper cites Scheduling.

Sequencing, task failures, and capacity when failures are driven by a non-homogeneous Poisson process Scheduling

Reference 13

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T06:01:59.963643Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.

source=arxiv_source observed=2026-08-07T06:01:59.888109Z digest=sha256:0dbdc08506b04c7b6cb75cb257559df169956d438735f491e77b3b91dfa83b44

Observation d5f6abfc-955f-486c-a64a-d5b48975cd79 · outbound

This paper cites A queue with service interruptions in an alternating random environment.

Sequencing, task failures, and capacity when failures are driven by a non-homogeneous Poisson process A queue with service interruptions in an alternating random environment

Reference 14

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T06:01:59.952448Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.

source=arxiv_source observed=2026-08-07T06:01:59.892113Z digest=sha256:234e6e89333f39c02a6e783909a74d27a2db402cdb3f38791a19547680d4b286

Observation 517bdda1-f56e-47de-b63e-83da489b8e01 · outbound

This paper cites A single server queue with service interruptions.

Sequencing, task failures, and capacity when failures are driven by a non-homogeneous Poisson process A single server queue with service interruptions

Reference 15

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T06:01:59.941824Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.

source=arxiv_source observed=2026-08-07T06:01:59.896331Z digest=sha256:e8d0c12cddc2ba2db727bb2f8e66bc2fc1db39c8de27d801d7f4e7cdd8454e8f

Observation 151a4daf-abc9-4969-962c-03bf415534d2 · outbound

This paper cites Young and Neville A.

Sequencing, task failures, and capacity when failures are driven by a non-homogeneous Poisson process Young and Neville A

Reference 16

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T06:01:59.929998Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.

source=arxiv_source observed=2026-08-07T06:01:59.900138Z digest=sha256:745723d87db42c7aec015788aafd2a50a4f85c49cace4e7b4d0c817e88683b48

Pith citing papers

No inbound Pith citation observations are available.