Pith. sign in

Paper Citation Record · LEDGER

Evaluating the Effect of Geometry and Control on Freeway Merge Bottleneck Capacity

As of 19 August 2026, this Paper Citation Record lists 17 of 17 outbound references and 0 inbound Pith citation observations for arXiv:1907.09606.

A citation records a reference. It does not transfer a finding from one paper to another.

pith.paper-citation-record.v1
1907.09606 v1

Coverage vector

measured 17 of 17 reference resolution

Typed states for the displayed outbound observations.

Source: paper_references, paper_reference_links, observed 2026-05-24T17:24:30.521044Z

measured 17 of 17 standing notices

One-hop event checks from named stored sources.

Source: scholarly_work_events, retraction_status_cache, observed 2026-08-19T06:32:44.657259+00:00

measured 0 of 0 inbound itemization

Pith citing papers itemized under the disclosed page cap.

Source: paper_references, paper_reference_links

measured 0 of 1 external citation measurements

A source-named dated measurement, never combined with another source.

Source: cited_works

Reference resolution

17 of 17 outbound references displayed

  • verified exact2
  • verified fuzzy12
  • unresolved3
  • parse uncertain0
  • malformed identifier0
  • metadata mismatch0

External citation measurements

No source-named external measurement is stored.

Outbound references

Observation 4585b540-6dab-4f82-b826-2974cc7e39d4 · outbound

This paper cites an unresolved cited work.

Evaluating the Effect of Geometry and Control on Freeway Merge Bottleneck Capacity Unresolved cited work

Reference 1

Resolution
unresolved
raw_fallback, observed 2026-05-24T17:24:45.144840Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.

source=pdf_text observed=2026-05-24T17:24:30.521044Z digest=sha256:495f4496a0ae21e393acd2e2e685adc5aef4051e5ae065228face80f94b419d9

Observation 91482204-e39d-482f-b885-8839b9dcf362 · outbound

This paper cites Elefteriadou, W.

Evaluating the Effect of Geometry and Control on Freeway Merge Bottleneck Capacity Elefteriadou, W

Reference 2

Resolution
verified fuzzy
raw_fallback, observed 2026-05-24T17:24:45.128456Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.

source=pdf_text observed=2026-05-24T17:24:30.521044Z digest=sha256:873dc69671bd241a32faed83f071ab72efcec7828efa101d78efeeac45dbbe9e

Observation 60a13412-a3f2-4b80-a426-448fbcb96e14 · outbound

This paper cites Mahnke, and J.

Evaluating the Effect of Geometry and Control on Freeway Merge Bottleneck Capacity Mahnke, and J

Reference 3

Resolution
verified fuzzy
raw_fallback, observed 2026-05-24T17:24:45.120840Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.

source=pdf_text observed=2026-05-24T17:24:30.521044Z digest=sha256:8ef3bc0fd780c8cfb7998ecf900cbe28dd02c7a2555d6132989f678a75bd5ed7

Observation 07e1b3e3-5759-4d52-adc7-2dc9bb1cb4f2 · outbound

This paper cites Watanabe, and T.

Evaluating the Effect of Geometry and Control on Freeway Merge Bottleneck Capacity Watanabe, and T

Reference 4

Resolution
verified fuzzy
raw_fallback, observed 2026-05-24T17:24:45.148644Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.

source=pdf_text observed=2026-05-24T17:24:30.521044Z digest=sha256:f2114c6ecf2f66e943e46402c388c711b52a13f4ee1c334c3b03113b9cd384b3

Observation 9100b0a9-0f81-486d-aadd-5ff2cfc12e73 · outbound

This paper cites Geistefeldt, a nd M.

Evaluating the Effect of Geometry and Control on Freeway Merge Bottleneck Capacity Geistefeldt, a nd M

Reference 5

Resolution
verified fuzzy
raw_fallback, observed 2026-05-24T17:24:45.140970Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.

source=pdf_text observed=2026-05-24T17:24:30.521044Z digest=sha256:b5aa3dc917cacba15745a1c54d4cdedac97c5cd032f5abadc7c23fe098ea4667

Observation 69504e28-0c42-4f58-862a-b43e1103b886 · outbound

This paper cites Elefteria dou.

Evaluating the Effect of Geometry and Control on Freeway Merge Bottleneck Capacity Elefteria dou

Reference 6

Resolution
verified fuzzy
raw_fallback, observed 2026-05-24T17:24:45.116993Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.

source=pdf_text observed=2026-05-24T17:24:30.521044Z digest=sha256:ed6aeb924f929650a31c1b12251eea0b1abcd8bfc19bbdb139d4145b6ab9d20f

Observation b5e19e0b-5465-4461-8ce2-b38307695838 · outbound

This paper cites an unresolved cited work.

Evaluating the Effect of Geometry and Control on Freeway Merge Bottleneck Capacity Unresolved cited work

Reference 7

Resolution
unresolved
raw_fallback, observed 2026-05-24T17:24:45.166017Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.

source=pdf_text observed=2026-05-24T17:24:30.521044Z digest=sha256:dfdae5b53a79488b3a0df597dbe3c27822eb56dd57e999c8bf82d4e999def97c

Observation b2fa5a16-46c8-4da6-8c4a-e9a151c0d35a · outbound

This paper cites an unresolved cited work.

Evaluating the Effect of Geometry and Control on Freeway Merge Bottleneck Capacity Unresolved cited work

Reference 8

Resolution
verified exact
doi, observed 2026-05-24T17:24:44.481247Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.

source=pdf_text observed=2026-05-24T17:24:30.521044Z digest=sha256:d4ebbecef1142649c776b7e0ec51d2ecc0dc408aae93efe987ecea399fdab326

Observation 69d8e8e8-d19c-4aea-b345-8c208d17b39e · outbound

This paper cites L., and P.

Evaluating the Effect of Geometry and Control on Freeway Merge Bottleneck Capacity L., and P

Reference 9

Resolution
verified fuzzy
raw_fallback, observed 2026-05-24T17:24:45.157644Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.

source=pdf_text observed=2026-05-24T17:24:30.521044Z digest=sha256:0f10306ba8951d43e8519f4025f10a72b578bf28c949db9725abf474c9f72307

Observation d597c980-545b-4b85-9803-6bc2526080f2 · outbound

This paper cites Evaluation of surv ival data and two new rank order statistics arising in its consideration.

Evaluating the Effect of Geometry and Control on Freeway Merge Bottleneck Capacity Evaluation of surv ival data and two new rank order statistics arising in its consideration

Reference 10

Resolution
verified fuzzy
raw_fallback, observed 2026-05-24T17:24:45.153278Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.

source=pdf_text observed=2026-05-24T17:24:30.521044Z digest=sha256:9b85d14efac7450eb94bcb9bd8d68c9a52c9722d729a1872b25606394d95cf17

Observation 565fe930-394f-40dc-a3ac-277e724d537a · outbound

This paper cites an unresolved cited work.

Evaluating the Effect of Geometry and Control on Freeway Merge Bottleneck Capacity Unresolved cited work

Reference 11

Resolution
unresolved
raw_fallback, observed 2026-05-24T17:24:45.161909Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.

source=pdf_text observed=2026-05-24T17:24:30.521044Z digest=sha256:e82910ff604addca7c7b1ce55f5178a9a48726685383f16844e1b5b2c67eb53a

Observation 231fd363-4ef7-4129-bb54-53ad23c80063 · outbound

This paper cites Geistefeldt, a nd H.

Evaluating the Effect of Geometry and Control on Freeway Merge Bottleneck Capacity Geistefeldt, a nd H

Reference 12

Resolution
verified fuzzy
raw_fallback, observed 2026-05-24T17:24:45.169911Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.

source=pdf_text observed=2026-05-24T17:24:30.521044Z digest=sha256:10428c72905761ffd6dd1ec293813033183101aa736196b7e928998e06b2724e

Observation 8d52164b-feca-46ee-96ca-e46264af5129 · outbound

This paper cites Geistefeldt , S.

Evaluating the Effect of Geometry and Control on Freeway Merge Bottleneck Capacity Geistefeldt , S

Reference 13

Resolution
verified exact
doi, observed 2026-05-24T17:24:44.477401Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.

source=pdf_text observed=2026-05-24T17:24:30.521044Z digest=sha256:3d3a6e99e5b22915f2b729dd7eac84ef771032cb4436fd29ab7d2ae8c7aa5416

Observation 2a284801-34e6-4d87-bbd9-f3d270420c3d · outbound

This paper cites Geistefeldt , L.

Evaluating the Effect of Geometry and Control on Freeway Merge Bottleneck Capacity Geistefeldt , L

Reference 14

Resolution
verified fuzzy
raw_fallback, observed 2026-05-24T17:24:45.136217Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.

source=pdf_text observed=2026-05-24T17:24:30.521044Z digest=sha256:f44568505c5174f1cfbfc07f031e28193952f93191217f7cd20f1d1d344ffa73

Observation 495cbd0a-2067-45c6-a745-b9539860ddca · outbound

This paper cites S., and M.

Evaluating the Effect of Geometry and Control on Freeway Merge Bottleneck Capacity S., and M

Reference 15

Resolution
verified fuzzy
raw_fallback, observed 2026-05-24T17:24:45.124462Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.

source=pdf_text observed=2026-05-24T17:24:30.521044Z digest=sha256:737924de7f663fdcf71bab01379e6486ae0f23ddb52967366617829bf8bb9f67

Observation 23c25cd6-0754-4365-85c4-d96bf662934f · outbound

This paper cites Robust tests for equality of variances.

Evaluating the Effect of Geometry and Control on Freeway Merge Bottleneck Capacity Robust tests for equality of variances

Reference 16

Resolution
verified fuzzy
raw_fallback, observed 2026-05-24T17:24:45.173854Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.

source=pdf_text observed=2026-05-24T17:24:30.521044Z digest=sha256:8dc429b569b36cbb55b08d484449d2ca2f4ff3edd87f4137ec7d2d6a5348a16a

Observation df4c2700-6f23-40b6-9da0-7f327a7e3703 · outbound

This paper cites B., and D.

Evaluating the Effect of Geometry and Control on Freeway Merge Bottleneck Capacity B., and D

Reference 17

Resolution
verified fuzzy
raw_fallback, observed 2026-05-24T17:24:45.132391Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-19T06:32:44.657259+00:00.

source=pdf_text observed=2026-05-24T17:24:30.521044Z digest=sha256:8b6dbd2d7946a6040bff23f4fee0b1669b61d5f656b065a02fff4cccb61eb2ed

Pith citing papers

No inbound Pith citation observations are available.