Pith. sign in

REVIEW

Two-stage Planning for Electricity-Gas Coupled Integrated Energy System with CCUS Considering Carbon Tax and Price Uncertainty

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 2107.09127 v2 pith:SRUFD2GX submitted 2021-07-19 eess.SY cs.SY

classification eess.SYcs.SY
keywords carbonplanningccusccppsconsideredpowerproposedsystem
verification ladder T0 review T1 audit T2 compute T3 formal

Signed reviews

No signed human review yet.

0 comments
read the original abstract

In this article, we propose two-stage planning models for Electricity-Gas Coupled Integrated Energy System (EGC-IES), in which traditional thermal power plants (TTPPs) are considered to be retrofitted into carbon capture power plants (CCPPs), with power to gas (PtG) coupling CCPPs to gas system. The sizing and siting of carbon capture, utilisation and storage (CCUS)/PtG facilities, as well as the operation cost of TTPPs/CCPPs/gas sources/PtG, are all considered in the proposed model, including penalty on carbon emissions and revenue of CCUS. With changing policy on climate change and carbon emission regulation, the uncertainties of carbon price and carbon tax are also analysed and considered in the proposed planning model. The stochastic planning, and robust planning methods are introduced to verify mutually through economic and carbon indices. The proposed methods' effectiveness in reducing carbon emissions, increasing profit of CCUS from EGC-IES are demonstrated through various cases and discussions.

Discussion (0). Continue with ORCID to comment.

Pith tools