Pith. sign in

REVIEW

Towards Reliable Acceleration of High-energy and High-intensity Electron Beams

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv physics/0008129 v3 pith:TRSLUDOO submitted 2000-08-18 physics.acc-ph

classification physics.acc-ph
keywords beamselectronkekblinaccommissioninghigh-intensityprojectring
verification ladder T0 review T1 audit T2 compute T3 formal
0 comments
read the original abstract

KEK electron linac was upgraded to 8 GeV for the KEK B-Factory (KEKB) project. During the commissioning of the upgraded linac, even continuing SOR ring injections, we had achieved a primary electron beam with 10-nC (6.24 x 10^10) per bunch up to 3.7-GeV for positron generation. This could be classified as one of the brightest S-band linac's. Since the KEKB rings were completed in December 1998, those 3.5-GeV position and 8-GeV electron beams have been injected with an excellent performance. Moreover, we have succeeded in switching among the high-intensity beams for KEKB and beams for two SOR rings with sufficient reproducibility. After the commissioning of the KEKB ring started, we have launched a project to stabilize the intensity and quality of the high-current beams furthermore, and have accomplished it investigating every conceivable aspect.