Pith. sign in

REVIEW

PIP-II Injector Test's Low Energy Beam Transport: Commissioning and Selected Measurements

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 1704.08744 v1 pith:U6AH7PTI submitted 2017-04-27 physics.acc-ph

classification physics.acc-ph
keywords beamcommissioningenergylebttesttransportacceleratoractivities
verification ladder T0 review T1 audit T2 compute T3 formal
0 comments
read the original abstract

The PIP2IT test accelerator is under construction at Fermilab. Its ion source and Low Energy Beam Transport (LEBT) in its initial (straight) configuration have been commissioned to full specification parameters. This paper introduces the LEBT design and summarizes the outcome of the commissioning activities.

Discussion (0). Sign in to comment.

Pith tools