pith. sign in

arxiv: 1704.08744 · v1 · pith:U6AH7PTInew · submitted 2017-04-27 · ⚛️ physics.acc-ph

PIP-II Injector Test's Low Energy Beam Transport: Commissioning and Selected Measurements

classification ⚛️ physics.acc-ph
keywords beamcommissioningenergylebttesttransportacceleratoractivities
0
0 comments X
read the original abstract

The PIP2IT test accelerator is under construction at Fermilab. Its ion source and Low Energy Beam Transport (LEBT) in its initial (straight) configuration have been commissioned to full specification parameters. This paper introduces the LEBT design and summarizes the outcome of the commissioning activities.

This paper has not been read by Pith yet.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.