Typed states for the displayed outbound observations.
Source: paper_references, paper_reference_links, observed 2026-08-07T11:44:16.446889Z
Paper Citation Record · LEDGER
As of 7 August 2026, this Paper Citation Record lists 80 of 80 outbound references and 0 inbound Pith citation observations for arXiv:2506.01694.
A citation records a reference. It does not transfer a finding from one paper to another.
Typed states for the displayed outbound observations.
Source: paper_references, paper_reference_links, observed 2026-08-07T11:44:16.446889Z
One-hop event checks from named stored sources.
Source: scholarly_work_events, retraction_status_cache, observed 2026-08-07T06:34:17.273281+00:00
Pith citing papers itemized under the disclosed page cap.
Source: paper_references, paper_reference_links
A source-named dated measurement, never combined with another source.
Source: cited_works
80 of 80 outbound references displayed
External citation measurements
No source-named external measurement is stored.
Observation 902cf8e9-497a-4858-ab36-1caf4facdb13 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Spitters, T
Reference 1
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 876789ab-d893-4317-8e7d-f205bd98144a · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Lecoutre, C
Reference 2
Source-reported events for the cited work
Unavailable: canonical work link unavailable.
Observation 14cd7f31-8334-48a1-aee3-005246a67140 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Fei, J
Reference 3
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 8d88fba2-5747-4f09-b93a-99e8a0c2b718 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Heath, D
Reference 4
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 38c7a1ed-cf8c-458f-8dd4-89e3d27e108f · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Shetab-Boushehri, S.N
Reference 5
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 67d413f6-37a0-4e90-99dd-2cc89116ed76 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Yang, M
Reference 6
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation dfc316fd-67cc-4115-93d1-3dd8514a6f28 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Morton, D.P
Reference 7
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 61dcf8ca-776d-442b-a885-b03a7ca7ed59 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Sturt, B
Reference 8
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 8ef3aa0f-10cf-43b9-b790-a9dd5cb610ff · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 9
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 81f41267-7eae-4a52-9ab5-1b0452c3a7b6 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Fliedner, M
Reference 10
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 551bc0f5-5caa-4c51-ae05-a5c6ada7dba1 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 11
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 72d8a379-758b-4c00-847a-e1fbcf645ba5 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Alem, D
Reference 12
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 61811ce3-2cd7-4401-9694-34b535de307a · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Puerto, J
Reference 13
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 91ec6131-632b-484e-b778-abc8dc94e3be · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 14
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 1b4fb8b7-fa56-4348-9037-2a488cdc0dc8 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Ruszczy\'nski, A
Reference 15
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 6b5a3d5d-0c5b-45fe-9201-85fc083b3d56 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Ruszczy\'nski, A
Reference 16
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 3c31fd24-fa22-4422-b72d-bc4bae3a7537 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Ruszczy\'nski, A
Reference 17
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 59c258c6-1110-46d8-bbb0-c8ffc95a4400 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 18
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 4a0fc2de-76ea-4d7b-adf6-8e61424506b9 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Morton, D.P
Reference 19
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 4557f3e7-24c6-482d-bfb1-2965594eb372 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Toriello A
Reference 20
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 9172c747-d4ab-4e27-b024-c1ed14b2f255 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Iyengar, G
Reference 21
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 7f513828-018d-4070-8b44-f160bb4f930a · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Unzueta, A
Reference 22
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 0da149c8-20f7-428e-aaf4-572390b84d48 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Unzueta, A
Reference 23
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 8a28a871-2154-4c7d-a950-163702602b6e · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Unzueta, A
Reference 24
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation c6bc767d-21f6-4335-b173-5f04825d639c · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme A methodology for the cross-dock door platforms design under uncertainty
Reference 25
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 5a146e05-6031-4d16-8b4c-d52166da1108 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Monge, J.F
Reference 26
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation c01319cf-59ad-4056-b6d0-ea1f3f26b5fa · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Monge, J.F
Reference 27
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation b691beff-2e0c-4572-904e-468531171537 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Data-driven Distributionally Robust Optimization Using the Wasserstein Metric: Performance Guarantees and Tractable Reformulations
Reference 28
Source-reported events for the cited work
Unavailable: canonical work link unavailable.
Observation 7feb98eb-5361-44b9-9964-a94bf8fde778 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 29
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation cffa4d7e-1c14-46e1-a3d5-e97cdf7f13cf · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Ravetti, M.G
Reference 30
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 6697b9e5-c6ce-4cee-9908-8ad39b450920 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 31
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation bb294284-b961-4ead-bc2a-4f6fa9c17bbd · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Manzini, R, (2022)
Reference 32
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 9e643465-e343-4326-9fd8-099503d3f66d · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Distributionally Robust Stochastic Optimization with Wasserstein Distance
Reference 33
Source-reported events for the cited work
Unavailable: canonical work link unavailable.
Observation 4157229b-e1d8-4b15-9c6c-d88c51b26545 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Oustry, F
Reference 34
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 2505ac42-d5e3-43db-b4b5-8669a5cd1889 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Todosijevic, R
Reference 35
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation be08f500-a2f6-4593-99f1-22ba3f1272bd · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Schultz, R
Reference 36
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation b603e8dc-09dd-4ef9-9659-1716a781594c · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Kashan, A.H
Reference 37
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 49679c2d-dffb-44c0-867f-1f35e51dd94b · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 38
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 405598ab-a8d0-4a95-9623-2663e34f30e9 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 39
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 03178b25-99e8-4031-bfd3-4ce5e06e56d3 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Wright, S
Reference 40
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 1ef84af4-0b49-46c0-b3db-2cac81c05bfd · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Pardalos, P.M
Reference 41
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 9cf3bfb2-d0ad-4b22-870d-7dec9f88835a · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Fukusima, M
Reference 42
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation f602edd4-a7c3-4477-8418-c45b8a66089f · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Chen, Z.-S
Reference 43
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 73828089-7648-479a-a004-e35510a6ca8a · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 44
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 6bbec420-6ab8-41be-938b-c9a32359dafa · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Khanfar, A
Reference 45
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 7c583248-007c-429e-a2ef-2b4f2ed0cbd7 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 46
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 86750b21-5518-4727-a055-3b340411ba0c · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 47
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation e0768028-ab8d-4211-854d-f8e6738939fb · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Chen, Z
Reference 48
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation fb62fb87-eb51-47dd-b56e-f0ed28917337 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 49
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation a397a508-42f2-4421-a992-8c8f59b85431 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Hashemi, H
Reference 50
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation dfdc3faa-a270-4f07-99d9-f5218cf46983 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 51
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 4da95833-a3e9-4176-9384-76811f5c9afa · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Jaumard, B
Reference 52
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 5cb3edb1-57f8-4ffd-9637-15e17217f05f · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Jaumard, B
Reference 53
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation cf621904-4e90-484c-9599-bd7521a77f66 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme de (2021)
Reference 54
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation ec4f101d-5056-445f-8049-2be213efa196 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme CRC Press
Reference 55
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation e1904f18-0d00-463d-8c31-fc766c5eb7f9 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Pichler, A
Reference 56
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation b1860f31-a6b1-41c6-8c7c-e5ffc692eb4f · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 57
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 533f3da7-2e47-4ea5-8e39-064a1a0bab5a · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Kapelevich, L
Reference 58
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 0892b95e-1889-4dbc-9393-007fecacfa20 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Available: www.r-project.org
Reference 59
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 37bd7ae4-7623-4916-adaf-a238fae24dbc · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 60
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 57a954b2-335f-4820-a80f-9976ade3e95b · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Delage, E
Reference 61
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 882c3479-2c25-419b-aa8a-7c7943897e92 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 62
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 83a42054-ce96-4d82-adf9-5ffddac74cf9 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Dolgui A
Reference 63
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation a3446cdc-1b09-42b3-88cf-ff62cdceca47 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 64
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 30886f67-cefb-4dc9-a539-676ce70e4452 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Ruszczynski, A
Reference 65
Source-reported events for the cited work
Unavailable: canonical work link unavailable.
Observation 1f2ab4cc-75e9-40e4-a627-fdb3c115d717 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Jiang, R
Reference 66
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 785cc9cc-b63e-4e62-868a-7a80141203a3 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 67
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 5ac7e7d0-3d00-47f9-91a3-c94b80067740 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 68
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 89adf9c8-f847-4db6-85a9-0b8e75486b10 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 69
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 0c33315b-aeab-4017-8a8d-aa8386c65138 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Cattrysse, D (2012)
Reference 70
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 8b1284f2-8a85-4bc0-a450-8f1f77bb02d8 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Hay, L.L
Reference 71
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation f30d8492-e119-4ce7-9a8f-dd0ffb592305 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 72
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 2c7b059b-8f73-4b35-aec3-627f7d0ff629 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 73
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 1b696808-d40c-4571-b859-d4de667f2741 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Andrejic, M
Reference 74
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 6ccbddd0-12a5-4d80-8468-bcb6694d06a8 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 75
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 83bb337f-7e15-4771-8752-25d9c1d3abc4 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 76
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 26dec029-6a2a-46ed-b7d8-fb1566f882e3 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 77
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 0af48897-c329-42e4-8d71-cb1a25ae0a5c · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Unzueta, A
Reference 78
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation bbba5ebe-dcfd-4523-999b-0aab83404c3c · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme Unresolved cited work
Reference 79
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
Observation 28703820-3738-4949-8ffc-bd980ce7e976 · outbound
Cross-Dock Door Design under Uncertainty: A two-stage DRO-based lower- and upper-bounding scheme & Kim, S
Reference 80
Source-reported events for the cited work
No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.
No inbound Pith citation observations are available.