Pith. sign in

REVIEW

The First 1 1/2 Years of TOTEM Roman Pot Operation at LHC

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 1110.5808 v1 pith:YFQYDWE3 submitted 2011-10-26 physics.ins-det

classification physics.ins-det
keywords controlpositionromantotemalignmentapproachingbeamscollecting
verification ladder T0 review T1 audit T2 compute T3 formal
0 comments
read the original abstract

Since the LHC running season 2010, the TOTEM Roman Pots (RPs) are fully operational and serve for collecting elastic and diffractive proton-proton scattering data. Like for other moveable devices approaching the high intensity LHC beams, a reliable and precise control of the RP position is critical to machine protection. After a review of the RP movement control and position interlock system, the crucial task of alignment will be discussed.

Discussion (0). Sign in to comment.

Pith tools