Pith. sign in

REVIEW

The INTEGRAL/IBIS telescope modelling

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv astro-ph/0107587 v1 pith:MPTYABIT submitted 2001-07-31 astro-ph

classification astro-ph
keywords ibismodelmasswillcalibratedcalibrationdataduring
verification ladder T0 review T1 audit T2 compute T3 formal
0 comments
read the original abstract

The main objective of the IBIS modeling activities is the generation of the IBIS spectral response matrix. This generation will be done step by step by firstly constructing "calibrated model" of each IBIS sub-systems. A "calibrated model" is defined as a GEANT Monte-Carlo model, further checked by intensive corresponding calibration. These calibrated models will be in a second step integrated in the whole IBIS Mass Model. This Mass Model will be checked and refined using the data obtained during the IBIS Telescope calibration, the PLGC during the ETET period, and the In-flight calibration data acquired during the whole INTEGRAL mission. The IBIS Mass Model will be used also for computations of efficiencies and transparencies. Some imaging studies (such as the study of the diffuse emission) may be also done with the help of the IBIS Mass Model. The IBIS Mass Model may be used for the simulation of IBIS data in order to check the different IBIS software.

Discussion (0). Sign in to comment.

Pith tools