DAFNE
classification
⚛️ physics.acc-ph
keywords
dafnebeenconfigurationdeardedicateddescribedduringexpectations
read the original abstract
The results of 2002 DAFNE operation for the two experiments KLOE and DEAR are described. During 2003 a long shutdown has been dedicated to the installation of new Interaction Regions (IR) and to hardware modifications and upgrades. In the last section optics studies and performances expectations for the new machine configuration are reported.
This paper has not been read by Pith yet.
discussion (0)
Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.