Pith. sign in

REVIEW 2 cited by

Realizing temporal transportation trees

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 2403.18513 v3 pith:CGLKC4PN submitted 2024-03-27 cs.DS

classification cs.DS
keywords periodicproblemrealizationrespecttemporaltreeboundsgraph
verification ladder T0 review T1 audit T2 compute T3 formal

Signed reviews

No signed human review yet.

0 comments
abstract

In this paper, we study the complexity of the periodic temporal graph realization problem with respect to upper bounds on the fastest path durations among its vertices. This constraint with respect to upper bounds appears naturally in transportation network design applications where, for example, a road network is given, and the goal is to appropriately schedule periodic travel routes, while not exceeding some desired upper bounds on the travel times. In our work, we focus only on underlying tree topologies, which are fundamental in many transportation network applications. As it turns out, the periodic upper-bounded temporal tree realization problem (TTR) has a very different computational complexity behavior than both (i) the classic graph realization problem with respect to shortest path distances in static graphs and (ii) the periodic temporal graph realization problem with exact given fastest travel times (which was recently introduced). First, we prove that, surprisingly, TTR is NP-hard, even for a constant period $\Delta$ and when the input tree $G$ satisfies at least one of the following conditions: (a) $G$ is a star, or (b) $G$ has constant maximum degree. Second, we prove that TTR is fixed-parameter tractable (FPT) with respect to the number of leaves in the input tree $G$, via a novel combination of techniques for totally unimodular matrices and mixed integer linear programming.

Discussion (0). Continue with ORCID to comment.

Forward citations

Cited by 2 Pith papers

Reviewed papers in the Pith corpus that reference this work. Sorted by Pith novelty score. Full citation record

  1. Temporal Graph Realization With Bounded Stretch

    cs.DS 2025-04 conditional novelty 7.0 of 10

    The paper defines Stretched Temporal Graph Realization (STGR), proves it is NP-hard to approximate within sublinear factors in the period, and provides approximation, fixed-parameter, and local-search algorithms.

  2. Exploring Temporal Graphs with Frequent and Regular Edges

    cs.DS 2025-05 reject novelty 6.0 of 10

    A temporal graph in which every edge appears at least once every F timesteps can be explored in F(2n-3) steps, and this is tight up to an additive constant.

Pith tools