KPG 193: A Synthetic Korean Power Grid Test System for Decarbonization Studies

T0 review · 3 major / 5 minor · reviewed 2026-08-12 · deepseek-v4-flash

Pith's one-line read The paper introduces a 193-bus synthetic Korean power grid built entirely from open 2022 data, and shows that this coarse model reproduces the real system's fuel mix, coastal generation, concentrated metropolitan load, and northward power…

desk verdict First open synthetic Korean grid dataset worth a serious look; the headline validation is calibrated rather than independent, but the artifact and honest limitations support peer review. read the letter →

arxiv 2411.14756 v2 pith:W3TFI4ZA submitted 2024-11-22 eess.SY cs.SY

classification eess.SYcs.SY
keywords synthetictestsystemKoreanpowergriddecarbonizationstudiesopendatamodelingunitcommitmentACoptimalflowrenewablegenerationprofilestransmissionnetworkclustering
verification ladder T0 review T1 audit T2 compute T3 formal

The pith

A machine-rendered reading of the paper's core claim, the machinery that carries it, and where it could break.

The reading

The paper introduces KPG 193, a 193-bus, 122-generator, 407-line synthetic model of the Korean transmission grid assembled entirely from open 2022 data. Because Korea does not publish its real grid topology, the authors build the network by clustering open map data, plant locations, demand, and weather around the utility's 193 regional offices. They then demonstrate the model's feasibility by solving daily unit commitment and hourly AC optimal power flow for all of 2022, obtaining fuel-generation shares within 1.4 percentage points of historical data. The resulting model reproduces Korea's defining pattern: coastal power plants, a metropolitan area consuming about 40% of demand, and persistent northward power flows over long 345/765 kV and 500 kV HVDC lines. If the construction is sound, researchers gain a public, reproducible Korean testbed for decarbonization and transmission-expansion studies.

What carries the argument

The load-bearing construction is clustering: every municipal-level dataset (230 municipal segments) is reassigned to 193 buses placed at the utility's regional offices; line endpoints are snapped to the nearest bus, plants are assigned to the nearest bus, demand is allocated from municipal monthly consumption plus population, and 1.5 km resolution weather fields are assigned per bus. This clustering is what preserves Korea's geographic character, coastal generation, metropolitan load of about 40%, and long transmission corridors, while hiding exact facility locations and keeping the model small enough for year-long simulations. Standard conductor-based line parameters and a manually added HVDC link complete the network.

What would settle it

Compute the transmission losses or the net power transfer crossing the metropolitan boundary in KPG 193's 2022 ACOPF solution and compare them with the real system's published figures; if the simulated interregional flow direction reverses, or losses differ by more than a few percent, the representative-clustering claim fails.

Watch

Extended reading notes

Core claim

The central discovery is that coarse spatial clustering onto 193 buses is enough to make a synthetic grid behave like the real Korean system in the ways that matter for planning: the annual generation mix by fuel matches the historical mix within 1.4 percentage points, unit commitment and ACOPF converge for every hour of 2022, and the peak-summer snapshot shows northward transfers and coastal overvoltage patterns consistent with the actual grid. The authors state this as a feasibility and representativeness result, not as an exact replica: the model is designed to capture Korea's low renewable penetration, concentrated urban demand, and isolated grid structure, and to provide a stable testbed rather than a faithful map.

Load-bearing premise

The load-bearing premise is that grouping the open, municipal-level maps and statistics onto 193 utility regional offices produces a network whose flows and voltages stand in for the real, undisclosed Korean grid; stale map data or distorted clustering would silently invalidate every simulation based on it.

Editorial extensions

If this is right

  • Researchers can run year-long unit commitment and AC optimal power flow on a public Korean grid model without needing confidential utility data.
  • Decarbonization scenarios that raise Korea's renewable share can be tested while preserving realistic geographic constraints, including the long coastal-to-metropolitan transfer corridors.
  • The 2022 weather dataset bundled with the model lets renewable profiles be recomputed at each bus, supporting storage-siting and transmission-expansion planning.
  • Because the model matches the historical 2022 fuel mix within 1.4 percentage points, it provides a baseline for calibrating future Korean grid studies.
  • The construction method transfers to other regions that publish municipal-level demand and generator data but keep their transmission topology confidential.

Reading between the lines

Editorial extensions of the paper, not claims the author makes directly.

  • Because the model omits shunt capacitors, STATCOMs, and tap-changing transformers, and fixes reactive demand at 90% of real power, voltage-magnitude results should be read as a structural pattern rather than a level; adding reactive-support devices would be the natural next test.
  • The same clustering recipe can be rerun on updated or historical open data to produce annual editions of KPG, turning the 2022 snapshot into a family of yearly grids for longitudinal decarbonization studies.
  • A stronger validation would compare simulated line flows or transmission losses against the operator's measured interregional transfers; such a check could quantify how much of the northward-flow signature is real signal versus an artifact of clustering.
Share X Bluesky LinkedIn Reddit HN

Editorial analysis

A structured set of objections, weighed in public.

Desk editor's note, referee report, and a circularity audit.

Referee Report

3 major / 5 minor

Summary. The paper presents KPG 193, a synthetic 193-bus, 122-generator, 407-transmission-line test system for the Korean power grid, constructed entirely from open data sources. The modeling workflow clusters OpenStreetMap transmission-line geometry, KPX/Korea Energy Agency generator data, KEPCO demand data, and LDAPS weather data onto 193 KEPCO regional offices. The system includes hourly 2022 demand, weather, and renewable profiles, and the authors report that daily unit commitment (UC) and hourly AC optimal power flow (ACOPF) simulations converge for the full year. Validation consists of a comparison of annual generation shares by fuel type in Table III and a qualitative snapshot comparison of power-flow directions and voltage magnitudes in Figures 3 and 4. The paper acknowledges limitations including the omission of compensation devices, uncertainty in OSM topology data, and a fixed reactive-power demand ratio of 90% of real power.

Significance. If the fidelity claims are supported, KPG 193 would fill a real gap: a public, spatio-temporally resolved Korean test system for decarbonization and expansion-planning studies, built from reproducible open data. The release of the dataset, the integration of hourly weather-derived renewable profiles, and the demonstrated convergence of year-long UC/ACOPF simulations are concrete strengths. However, the current evidence for representativeness is weaker than the paper's language suggests. The main quantitative validation is partly circular because cost coefficients were fit to reduce discrepancies, and the spatial topology derived from OSM clustering plus manual adjustment is not independently checked against any real or independently derived Korean grid property. The paper needs either additional validation or a more careful framing of what is being claimed.

major comments (3)
  1. [Section III, Table III, Eq. (3)] The validation reported in Table III is partly circular and should be reframed. The text states that generator cost coefficients were "modified using methodologies from [9] to reduce discrepancies with historical data," and Table III then presents the resulting annual generation shares as a successful validation. Since the UC generation mix is a direct output of those fitted cost coefficients, the 1.4% deviation is a calibration result, not an independent test of the model. Please either (a) validate against quantities not used in fitting, such as hourly dispatch patterns, regional generation shares, or an out-of-sample year; or (b) explicitly state that Table III demonstrates calibration quality, and move the fidelity claim to quantities that are not fitted.
  2. [Section II-B-1, Sections II-A-1 and IV, Figs. 3-4] The representativeness of the network topology is under-supported. OSM line endpoints are clustered to the nearest of 193 KEPCO regional offices, and "some line connection points were manually adjusted," but no evidence is given that the resulting 407-line model preserves electrical distances, transfer capacities, impedance distribution, or even gross connectivity relative to the actual Korean grid. Section IV itself notes that OSM has "uncertain update schedules" and topology accuracy issues. Figures 3 and 4 are therefore outputs of an unvalidated synthetic topology, not comparisons with measured or independently derived grid behavior. To support the claim that the model "captures" the real grid's flow and voltage patterns, I would need at least one independent aggregate check, for example comparing inter-regional transfer capacities or line utilization with KPX data, or a sensitivity analysis showing that the reported flow directions and voltage patterns are robust to the clustering and manual-adjustment choices.
  3. [Section IV and Fig. 4] The voltage-related fidelity claim is weakened by the paper's own list of omissions. Section IV states that no compensation devices (shunt capacitors, STATCOMs, tap-changing transformers) are included and that nodal reactive power demand is fixed at 90% of real power. Under these conditions, the voltage heatmap in Fig. 4 cannot be presented as a replication of actual Korean grid voltage behavior; it is a stress-test-style result of a model without voltage-control equipment. The authors should either add representative compensation devices or clearly label the voltage pattern as illustrative and qualitative, rather than using it as evidence that the test system "successfully captured ... voltage patterns observed in the actual grid."
minor comments (5)
  1. [Abstract and Section II-C] The number of generators is inconsistent: the abstract in the header says 123 generators, while the full-text abstract and Section II-C say 122 generators. Please reconcile this discrepancy.
  2. [Section V] There is a typo in the conclusion: "devloping" should be "developing."
  3. [Section III] The sentence "The Korean power system is characterized by a concentrated of electricity demand" contains a grammatical error; it should read "a concentration of electricity demand."
  4. [Table I and Section II-A-1] The HVDC line is mentioned as manually added, but no electrical parameters or ratings for this line are provided in Table I or elsewhere. Please add the HVDC line parameters or cite where they can be found.
  5. [Table IV] Table IV covers thermal generator parameters but does not list the renewable-curve constants v_CI, v_R, v_CO, and FF_PV introduced in Eqs. (1)-(2). Please provide the numerical values or a reference for these constants.

Circularity Check

1 steps flagged · score 6.0 of 10

The Table III generation-share validation is partly circular: cost coefficients were explicitly modified to reduce discrepancies with historical data, and Table III then reports the resulting match as validation.

  1. fitted input called prediction [Section III (Validation), Table III and preceding paragraph]
    "Table III presents the validation of generation results through comparison with actual system data [28], with deviations within 1.4%. Since UC parameters and generation cost coefficients are not available, we derived parameters from [31] and [32]. In addition, we modified the cost coefficients using methodologies from [9] to reduce discrepancies with historical data."

    The annual generation shares in Table III are outputs of the UC model, but the model's cost coefficients were explicitly modified to reduce discrepancies with historical dispatch data. UC dispatch is driven by these cost coefficients, so tuning them against the same historical generation-share series used as the validation target makes the reported 1.4% deviation a measure of calibration goodness-of-fit rather than an independent validation. The claim that KPG 193 reproduces Korea's fuel-mix shares therefore reduces by construction to the fitted inputs. The model's convergence and qualitative flow/voltage patterns remain additional evidence, but the paper's headline quantitative validation is a calibration check presented as a prediction.

full rationale

The central circular step is confined to Section III: the paper modifies generation cost coefficients using methods from reference [9] to reduce discrepancies with historical data, and then uses Table III, which compares annual generation shares with historical KPX data, as validation. Because unit commitment dispatch depends directly on those cost coefficients, the match within 1.4 percentage points is a check of the calibration, not an independent test of the synthetic system. This warrants a score near the 'partial circularity' band. The topology construction by clustering OSM line endpoints to KEPCO regional offices is not itself circular, since the resulting power-flow directions and voltage patterns in Figures 3 and 4 are emergent simulation outputs rather than inputs; however, these qualitative patterns are not validated against measured or independently derived grid behavior, which is a correctness/representativeness concern rather than a circularity concern. No load-bearing self-citation chain was found: reference [9] is an external US test-system paper, and the renewable profile equations and generator parameters come from independent published sources. Feasibility of the UC/ACOPF simulations is a standalone computational result. Overall, the paper's main quantitative validation reduces in part to its fitted inputs, but the test system's construction and convergence claims retain independent content, giving a score of 6.

Assumptions & free parameters 3 free parameters · 9 assumptions · 1 invented entities

The model depends on many open-data approximations because Korea does not disclose real grid information. The main independent inputs are OSM topology, municipal capacity and demand statistics, LDAPS weather, and standard UC and ACOPF formulations. The least independent inputs are the fitted generator cost coefficients used in validation and the fixed reactive demand ratio. No new physical forces or particles are proposed; the only invented entity is the synthetic grid artifact itself, which lacks direct external validation.

free parameters (3)
  • Generator cost coefficients Cg(2), Cg(1), Cg(0) = Ranges in Table IV (e.g., LNG Cg(1) 36,872 to 70,956 KRW/MWh; coal Cg(2) 25.61 to 30.57 KRW/MW2h)
    Authors modified these coefficients to reduce discrepancies with historical 2022 generation data, then used the resulting annual mix as validation; UC dispatch is sensitive to these values.
  • Nodal reactive power ratio Q/P = 0.9
    Fixed at 90% of real power demand by hand; this choice strongly affects ACOPF voltage results and is acknowledged in the limitations.
  • Wind and solar profile constants (vCI, vR, vCO, FF_PV) = Adopted from reference [29], numerical values not stated
    These constants determine the hourly renewable generation profiles in Eqs. (1) and (2); they are taken from prior literature rather than Korean plant data, so they are model parameters assumed applicable.
assumptions (9)
  • domain assumption KEPCO regional offices can serve as buses and clustering around them preserves Korean grid geography
    Section II-B-1 assigns network endpoints, generators, and demand to the 193 offices; no comparison to actual bus locations is possible because official topology is undisclosed.
  • domain assumption OSM power line and cable data is sufficiently complete and accurate for the synthetic topology
    Section II-A-1 uses Overpass API data; limitations acknowledge OSM has uncertain update schedules and known topology accuracy issues.
  • domain assumption Standard conductor coefficients and catalog parameters model Korean AC line impedance
    Section II-A-1 and Table I use coefficients from manufacturer catalogs without validation against measured Korean line parameters.
  • domain assumption Wind and solar output follows the power-curve and PV models in Eqs. (1) and (2)
    Renewable profiles are generated from LDAPS weather using equations from Atwa [29]; this assumes those models capture Korean plant behavior with fixed constants.
  • domain assumption Uniform hydro profile across all buses is representative
    Section II-B-3 derives U_t from historical total hydro generation and applies it uniformly, although actual hydro output is spatially heterogeneous.
  • domain assumption Generator technical parameters from US systems (ISO-NE and WWSIS) are transferable to Korean units
    Section III and Table IV adopt, randomize, and modify parameters from references [31] and [32] because Korean UC parameters are unavailable.
  • domain assumption Population-based allocation of municipal demand to buses preserves the spatial demand pattern
    Section II-B-2 distributes demand proportionally to population within service areas, but electricity demand intensity may differ from population density.
  • standard math Standard UC and ACOPF mathematical formulations are valid for feasibility testing
    Section III solves problems from Morales-España [33] and PowerModels [34]; this is standard power system optimization, not new mathematics.
  • ad hoc to paper Fixed reactive demand at 90% of real power and omission of compensation devices still yields adequate voltage behavior
    The limitations section states that shunt capacitors, STATCOMs, tap-changing transformers are omitted and nodal reactive demand is fixed; this is an ad hoc modeling choice that affects voltage validation.
invented entities (1)
  • KPG 193 synthetic Korean power grid
    purpose: Open benchmark test system for unit commitment, ACOPF, and decarbonization studies
    The model is a constructed stand-in for the undisclosed real Korean grid. It can be run and inspected by others, but no independent measurements confirm that its topology and voltage behavior match the real system; fidelity rests on open-data approximations, manual adjustments, and fitted costs.

how reviews work

0 comments
Cite this review

Pith. "Pith review of KPG 193: A Synthetic Korean Power Grid Test System for Decarbonization Studies." pith.science (2026). https://pith.science/paper/W3TFI4ZA

@misc{pith2026241114756,
  author       = {Pith},
  title        = {Pith review of: KPG 193: A Synthetic Korean Power Grid Test System for Decarbonization Studies},
  year         = {2026},
  howpublished = {\url{https://pith.science/paper/W3TFI4ZA}},
  note         = {Machine review of arXiv:2411.14756}
}
read the original abstract

This paper introduces the 193 bus synthetic Korean power grid (KPG 193), developed using open data sources to address recent challenges of the Korean power system. The KPG 193 test system serves as a valuable platform for decarbonization research, capturing Korean low renewable energy penetration, concentrated urban energy demand, and isolated grid structure. Clustering techniques were applied to preserve key system characteristics while maintaining computational tractability and representativeness. The system includes 193 buses, 123 generators, 407 transmission lines, and incorporates temporal weather datasets. Its feasibility was validated through Unit Commitment (UC) and AC Optimal Power Flow (ACOPF) simulations using 2022 demand and renewable generation data. This test system aims to provide a foundational framework for modeling and analyzing the Korean power grid.

Figures

Figures reproduced from arXiv: 2411.14756 by the authors.

Figure 1
Figure 1. Workflow for developing the KPG 193 test system with data sources and processes for modeling network topology, generator parameters, weather data, and electrical demand. Red and blue letters correspond to subsections in this paper that detail each process. plants and electrical loads is publicly available only at the municipal level [15], [16], comprising 230 segments. This limitation introduces considerable uncerta… view at source ↗
Figure 2
Figure 2. Network topology and generation mix for the KPG 193 test system. Pie charts indicate the generation mix by fuel type, with sizes reflecting relative generation capacities. Transmission lines are distinguished by voltage levels, as shown in the legend. TABLE III. COMPARISON OF ANNUAL ELECTRIC GENERATION SHARE BY FUEL TYPE IN 2022: HISTORICAL DATA AND KPG193 Coal Gas Nuclear Renewables Etc.∗ Total Historical [%] 32.5%… view at source ↗
Figure 3
Figure 3. Direction of power flow in 765kV and 345kV AC lines and 500kV DC line during the summer peak day at 13:00. The arrows indicate the direction of power flow, and the dashed circle highlights the region accounting for 40% of the total electrical demand. for the entire year of 2022. Table III presents the validation of generation results through comparison with actual system data [28], with deviations within 1.4%. Since… view at source ↗

Discussion (0). Continue with ORCID to comment.

Forward citations

Cited by 1 Pith paper

Reviewed papers in the Pith corpus that reference this work. Sorted by Pith novelty score. Full citation record

  1. The GIST Korea Test System: A Public-Data Synthetic Model of the Korean Power Grid

    eess.SY 2026-06 unverdicted novelty 7.0 of 10

    A public-data, native-resolution synthetic model of the Korean transmission grid (2,217 buses) traces its layout from OpenStreetMap, calibrates circuit counts to national statistics, and ships a frozen 85 GW power-flo...

Reference graph

Works this paper leans on

37 extracted references · 37 canonical work pages · cited by 1 Pith paper

  1. [9]

    US test system with high spatial and temporal resolution for renewable integration studies,

    Y . Xu et al., “US test system with high spatial and temporal resolution for renewable integration studies,” in 2020 IEEE Power & Energy Society General Meeting (PESGM) . IEEE, 2020, pp. 1–5

  2. [1]

    Toward sustainable energy connectivity in asia and the pacific: status, trends, and opportunities,

    ESCAP, UN, “Toward sustainable energy connectivity in asia and the pacific: status, trends, and opportunities,” 2022

  3. [2]

    Korea - key energy statistics,

    International Energy Agency (IEA), “Korea - key energy statistics,”

  4. [3]

    Scigrid: Open source transmission net- work model, user guide (v 0.2),

    W. Medjroubi and C. Matke, “Scigrid: Open source transmission net- work model, user guide (v 0.2),” 2015

  5. [4]

    Scharf and A

    M. Scharf and A. Nebel, osmTGmod 0.1.1: Documentation , Wuppertal Institute, March 2016

  6. [5]

    How good is volunteered geographical information? a comparative study of openstreetmap and ordnance survey datasets,

    M. Haklay, “How good is volunteered geographical information? a comparative study of openstreetmap and ordnance survey datasets,” Environment and Planning B: Planning and Design , vol. 37, no. 4, pp. 682–703, 2010

  7. [6]

    Pypsa-eur: An open optimisation model of the european transmission system,

    J. Hoersch et al. , “Pypsa-eur: An open optimisation model of the european transmission system,” Energy Strategy Reviews , vol. 22, pp. 207–215, 2018

  8. [7]

    Transmission System Map,

    ENTSO-E, “Transmission System Map,” 2024. [Online]. Available: https://www.entsoe.eu/data/map/

Show all 37 references
  1. [8]

    Electric grid test case repository,

    Texas A&M University, “Electric grid test case repository,” 2024. [Online]. Available: https://electricgrids.engr.tamu.edu/

  2. [10]

    A synthetic texas backbone power system with climate- dependent spatio-temporal correlated profiles,

    J. Lu et al. , “A synthetic texas backbone power system with climate- dependent spatio-temporal correlated profiles,”arXiv e-prints, pp. arXiv– 2302, 2023

  3. [11]

    Evaluation for maximum allowable capacity of renewable energy source considering ac system strength measures,

    Y .-K. Kim et al. , “Evaluation for maximum allowable capacity of renewable energy source considering ac system strength measures,” IEEE Trans. on Sust. Energy , 2022

  4. [12]

    A clean energy korea by 2035, transitioning to 80% carbon-free electricity generation,

    W. Y . Park et al., “A clean energy korea by 2035, transitioning to 80% carbon-free electricity generation,” 2023

  5. [13]

    South korea reduced network,

    SEND-LAB, “South korea reduced network,” 2023. [Online]. Available: https://github.com/SEND-LAB

  6. [14]

    Synthetic Korean Power Grid (KPG) 193-bus test system dataset,

    “Synthetic Korean Power Grid (KPG) 193-bus test system dataset,” Nov 2024. [Online]. Available: https://sites.google.com/view/ego-lab/ resources/kpg-test-system

  7. [15]

    Supply statistics cumulative supply capacity - regional cumulative supply capacity (basic),

    Korea Energy Agency, “Supply statistics cumulative supply capacity - regional cumulative supply capacity (basic),” July 2023. [Online]. Avail- able: https://www.knrec.or.kr/biz/statistics/supply/supply03 03 list.do

  8. [16]

    Electricity sales volume by city/county/district,

    KEPCO, “Electricity sales volume by city/county/district,” February

  9. [17]

    Open data in power grid modelling: new approaches towards transparent grid models,

    Medjroubi et al., “Open data in power grid modelling: new approaches towards transparent grid models,” Energy Reports , vol. 3, pp. 14–21, 2017

  10. [18]

    Overpass Turbo,

    M. Raifer, “Overpass Turbo,” 2024. [Online]. Available: https: //overpass-turbo.eu/

  11. [19]

    L. L. Grigsby, Electric power generation, transmission, and distribution. CRC press, 2007

  12. [20]

    Catalog of extra-high voltage cable systems,

    ILJIN Electric, “Catalog of extra-high voltage cable systems,” 2023. [Online]. Available: https://www.iljinelectric.co.kr

  13. [21]

    Transmitting power to cities: Ge’s hvdc technology powers a densely populated south korean city,

    General Electric Company, “Transmitting power to cities: Ge’s hvdc technology powers a densely populated south korean city,” GE Grid Solutions, Tech. Rep., 2018. [Online]. Avail- able: https://www.gevernova.com/grid-solutions/products/applications/ hvdc/bukdangjin-hvdc-lcc-cas...

  14. [22]

    Transmission of electricity in south korea: Q&a,

    KPX, “Transmission of electricity in south korea: Q&a,” July 2023. [Online]. Available: https://www.kpx.or.kr/board.es?mid= a10504030000&bid=0048&act=view&list no=69966

  15. [23]

    Local data assimilation and prediction system (ldaps)

    Korea Meteorological Administration, “Local data assimilation and prediction system (ldaps).” [Online]. Available: https://data.kma.go.kr

  16. [24]

    Hourly national electricity demand by city/county/district - 2022-12-31,

    KPX, “Hourly national electricity demand by city/county/district - 2022-12-31,” February 2023. [Online]. Available: https://www.data.go. kr/data/15065266/fileData.do#layer data infomation

  17. [25]

    Kepco introduction, organization, regional offices,

    KEPCO, “Kepco introduction, organization, regional offices,” November 2024. [Online]. Available: https://home.kepco.co.kr/kepco/ CU/CUIBPP002/main.do?menuCd=FN0101011002

  18. [26]

    2023 population and housing census,

    Statistics Korea, “2023 population and housing census,” 2023. [Online]. Available: https://kosis.kr/eng/

  19. [27]

    [Online]

    QGIS Development Team, QGIS Geographic Information System , QGIS Association, 2024. [Online]. Available: https://www.qgis.org

  20. [28]

    2022 hourly generation capacity and power transaction volume by fuel type,

    KPX, “2022 hourly generation capacity and power transaction volume by fuel type,” March 2024. [Online]. Available: https://epsis.kpx.or.kr/ epsisnew/selectEkifBoardList.do?menuId=080100&boardId=010000

  21. [29]

    Optimal renewable resources mix for distribution system energy loss minimization,

    Y . Atwa et al. , “Optimal renewable resources mix for distribution system energy loss minimization,” IEEE Transactions on Power Systems, vol. 25, no. 1, pp. 360–370, 2009

  22. [30]

    R. D. Zimmerman and C. E. Murillo-Sanchez, MATPOWER User’s Manual, Version 8.0, MATPOWER, 2024

  23. [31]

    The western wind and solar integration study phase 2 (executive summary),

    D. Lew and G. Brinkman, “The western wind and solar integration study phase 2 (executive summary),” National Renewable Energy Laboratory (NREL), Golden, CO (United States), Tech. Rep., 2013

  24. [32]

    An 8-zone test system based on iso new england data: Development and application,

    D. Krishnamurthy et al. , “An 8-zone test system based on iso new england data: Development and application,” IEEE Transactions on Power Systems, vol. 31, no. 1, pp. 234–246, 2015

  25. [33]

    Tight and compact milp formulation for the ther- mal unit commitment problem,

    Morales-Espa ˜na et al., “Tight and compact milp formulation for the ther- mal unit commitment problem,” IEEE Transactions on Power Systems , vol. 28, no. 4, pp. 4897–4908, 2013

  26. [34]

    Powermodels. jl: An open-source framework for ex- ploring power flow formulations,

    C. Coffrin et al., “Powermodels. jl: An open-source framework for ex- ploring power flow formulations,” in 2018 Power Systems Computation Conference (PSCC), 2018, pp. 1–8

  27. [35]

    Weekly generator maintenance plan,

    KPX, “Weekly generator maintenance plan,” 2022. [Online]. Available: https://www.kpx.or.kr/board.es?mid=a10109030500&bid=0018

  28. [2023]

    Available: https://home.kepco.co.kr/kepco/KO/ntcob/ list.do?boardCd=BRD 000283&menuCd=FN05030105

    [Online]. Available: https://home.kepco.co.kr/kepco/KO/ntcob/ list.do?boardCd=BRD 000283&menuCd=FN05030105

  29. [2024]

    Available: https://www.iea.org/countries/korea

    [Online]. Available: https://www.iea.org/countries/korea