Widespread SSSC deployment on U.S. transmission lines reduces annualized system costs by $1.9 billion or cuts required transmission expansion by 20%, with highest value in the Midwest for moving wind power eastward.
Multi-objective resilient-constrained generation and transmission ex- pansion planning against natural disasters
1 Pith paper cite this work. Polarity classification is still indexing.
1
Pith paper citing it
fields
eess.SY 1years
2026 1verdicts
UNVERDICTED 1representative citing papers
citing papers explorer
-
Economic Valuation and Optimal Deployment of Static Synchronous Series Compensators for U.S. Power System Expansion
Widespread SSSC deployment on U.S. transmission lines reduces annualized system costs by $1.9 billion or cuts required transmission expansion by 20%, with highest value in the Midwest for moving wind power eastward.