Recognition: unknown
The prototyping/early construction phase of the BAIKAL-GVD project
read the original abstract
The Prototyping phase of the BAIKAL-GVD project has been started in April 2011 with the deployment of a three string engineering array which comprises all basic elements and systems of the Gigaton Volume Detector (GVD) in Lake Baikal. In April 2012 the version of engineering array which comprises the first full-scale string of the GVD demonstration cluster has been deployed and operated during 2012. The first stage of the GVD demonstration cluster which consists of three strings is deployed in April 2013. We review the Prototyping phase of the BAIKAL-GVD project and describe the configuration and design of the 2013 engineering array.
This paper has not been read by Pith yet.
Forward citations
Cited by 1 Pith paper
-
Little Red Dots as Hidden Neutrino Sources
Little Red Dots can contribute ~30% of the diffuse neutrino background at TeV-sub-PeV energies through photomeson production in black hole envelopes, with modified flavor ratios at higher energies.
discussion (0)
Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.