Pith. sign in

REVIEW

First neutron data recorded at the V20 Test Instrument utilizing prototype chopper systems and beam monitors planned for ESS

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 1908.08041 v1 pith:THESZRSQ submitted 2019-08-21 physics.ins-det nucl-ex

classification physics.ins-detnucl-ex
keywords chopperdataneutronintegrationtestinstrumentprototypesoftware
verification ladder T0 review T1 audit T2 compute T3 formal
0 comments
read the original abstract

The main objective of the European Spallation Source (ESS) is to perform consistently high impact neutron scattering science using the highest neutron flux of any facility in its class. This ambition is naturally accompanied by operational challenges related to the vertical integration of the instruments' hardware and software shared between collaborators from 13 European countries. The present work will detail integration tests performed at the V20 Test Instrument at Helmholtz-Zentrum Berlin in Germany. An ESS chopper prototype was successfully controlled through the ESS Chopper Integration Controller (CHIC) and Experimental Physics and Industrial Control System (EPICS). Neutron data were successfully collected and time stamped using neutron beam monitors, the ESS prototype detector readout electronics and the Data Management Software Center (DMSC) data acquisition (DAQ) software. Chopper rotation events were timestamped and the chopper disk showed excellent stability and neutron absorption characteristics. The test resulted in (i) the expected time-of-flight (TOF) response, (ii) collected data that compared well with instrument reference data and (iii) revealing the diagnostic power of the performed integration tests. The results of this integration test validate the ESS chopper and detector DAQ architecture choices.

Discussion (0). Sign in to comment.

Pith tools