Accounting for spatiality of renewables and storage in transmission planning

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 2108.04863 v1 pith:I4XCBBMO submitted 2021-08-10 physics.soc-ph

Accounting for spatiality of renewables and storage in transmission planning

classification physics.soc-ph
keywords renewableselectricityenergyexpansiongermangridplanningsector
verification ladder T0 review T1 audit T2 compute T3 formal T4 reserved
0 comments
read the original abstract

The current governance process to plan the German energy system omits two options to substitute grid expansion: First, placing renewables closer to demand instead of where site conditions are best. Second, utilizing storage instead of additional transmission infrastructure to prevent grid congestion. In the paper, we apply a comprehensive capacity expansion model based on the AnyMOD modelling framework to compare the status quo to alternative planning approaches for a fully renewable energy system. To represent spatiality and fluctuations of renewables, the German electricity sector is modelled with great spatio-temporal detail of 32 NUTS2 regions and hourly time-steps. In addition to the German electricity sector, analysis also accounts for exchange of energy with the rest of Europe and demand for electricity and electricity-based fuels, like hydrogen or synthetic gases, from the industry, transport, and heat sector. The results reveal that a first-best solution can be well approximated if the current planning approach also considered storage for congestion management. Placing renewables different has no significant effect in our case, because the available potential must be exploited almost entirely leaving little room for optimization. Furthermore, a sensitivity on the first-best scenario prohibiting additional transmission lines entirely suggests that grid expansion can be substituted at tolerable costs.