Pith. sign in

REVIEW

Scalable Rail Planning and Replanning with Soft Deadlines

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 2306.06455 v1 pith:ONV3Z3I6 submitted 2023-06-10 cs.RO cs.MA

Scalable Rail Planning and Replanning with Soft Deadlines

classification cs.RO cs.MA
keywords flatlandtrainscompetitiondesignedefficientlyintroducesmapf-lnsnetwork
verification ladder T0 review T1 audit T2 compute T3 formal T4 reserved
0 comments
Share X Bluesky LinkedIn Reddit HN
read the original abstract

The Flatland Challenge, which was first held in 2019 and reported in NeurIPS 2020, is designed to answer the question: How to efficiently manage dense traffic on complex rail networks? Considering the significance of punctuality in real-world railway network operation and the fact that fast passenger trains share the network with slow freight trains, Flatland version 3 introduces trains with different speeds and scheduling time windows. This paper introduces the Flatland 3 problem definitions and extends an award-winning MAPF-based software, which won the NeurIPS 2020 competition, to efficiently solve Flatland 3 problems. The resulting system won the Flatland 3 competition. We designed a new priority ordering for initial planning, a new neighbourhood selection strategy for efficient solution quality improvement with Multi-Agent Path Finding via Large Neighborhood Search(MAPF-LNS), and use MAPF-LNS for partially replanning the trains influenced by malfunction.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.