The authors' main claim This roadmap document describes the need for significant increases in resources for ILC test beam activities.
The compiled record
The paper's own sentences, arranged. Each label is drawn from a closed vocabulary; the number beside it is the probability the classifier gave that label. Numbers in the tables are the authors', checked by code. No sentence in this record was written by a model.
Open the compiled record
The abstract, sentence by sentence
This document provides a roadmap for ILC detector test beam needs in the next 3 - 5 years. In this period, detector Letters of Intent are expected by fall 2008, the ILC Engineering Design Report to be submitted in ILC and its detectors in 2012. ILC detectors are required to have unprecedented precision to be able to elucidate new physics discoveries at TeV energies from the LHC and ILC machines, and to fully exploit experimental investifation at the electrweak unification energy scale. Ahieving this requires significant investment for detector test beam activities to complete the R&D needed, to test prototypes and (later) to qualify final detector system desgns, including integated system tess. This roadmap document describes the need for significant increases in resources for ILC test beam activities. It should be used by test beam facility managers and the worldwide ILC leadership to assure that the necessary resources and facilities are made available to meet the needs in time.
background contribution method result interpretation main claim
| # | sentence | role | the authors' own work | states the main conclusion | strength |
|---|---|---|---|---|---|
| s0 | This document provides a roadmap for ILC detector test beam needs in the next 3 - 5 years. | contribution 0.98 | 0.46 | 0.17 | asserted 0.99 |
| s1 | In this period, detector Letters of Intent are expected by fall 2008, the ILC Engineering Design Report to be submitted in ILC and its detectors in 2012. | background 0.62 | 0.09 | 0.06 | asserted 0.53 |
| s2 | ILC detectors are required to have unprecedented precision to be able to elucidate new physics discoveries at TeV energies from the LHC and ILC machines, and to fully exploit experimental investifation at the electrweak unification energy scale. | background 1.00 | 0.06 | 0.07 | asserted 1.00 |
| s3 | Ahieving this requires significant investment for detector test beam activities to complete the R&D needed, to test prototypes and (later) to qualify final detector system desgns, including integated system tess. | background 0.65 | 0.08 | 0.21 | asserted 0.99 |
| s4 | This roadmap document describes the need for significant increases in resources for ILC test beam activities. | contribution 0.85 | 0.36 | 0.74 | asserted 1.00 |
| s5 | It should be used by test beam facility managers and the worldwide ILC leadership to assure that the necessary resources and facilities are made available to meet the needs in time. | future work 0.97 | 0.06 | 0.22 | asserted 0.66 |
What was examined, and what was not
- arXiv listing abstract v1
- full text
- figures and tables
- references and citing sentences
- relations to other papers
- P abstract
- S sections
- T body sentences
- C citations
- R cross-paper relations
The paper
Original abstract
This document provides a roadmap for ILC detector test beam needs in the next 3 - 5 years. In this period, detector Letters of Intent are expected by fall 2008, the ILC Engineering Design Report to be submitted in ILC and its detectors in 2012. ILC detectors are required to have unprecedented precision to be able to elucidate new physics discoveries at TeV energies from the LHC and ILC machines, and to fully exploit experimental investifation at the electrweak unification energy scale. Ahieving this requires significant investment for detector test beam activities to complete the R&D needed, to test prototypes and (later) to qualify final detector system desgns, including integated system tess. This roadmap document describes the need for significant increases in resources for ILC test beam activities. It should be used by test beam facility managers and the worldwide ILC leadership to assure that the necessary resources and facilities are made available to meet the needs in time.
Human review
How the literature uses it
1 arXiv paper cite this in 1 sentence
Papers citing it
Cites it as background 1 paper
-
After the test beam workshop at Fermilab in 2007 all needs were summarised in a document [ref] .