Pith. sign in

REVIEW

Central Acceptance Testing for Camera Technologies for CTA

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 1508.06074 v1 pith:MCHD5EJE submitted 2015-08-25 astro-ph.IM

classification astro-ph.IM
keywords camerawilltestsperformancetesttestingdifferentdurability
verification ladder T0 review T1 audit T2 compute T3 formal
0 comments
read the original abstract

The Cherenkov Telescope Array (CTA) is an international initiative to build the next generation ground based very-high energy gamma-ray observatory. It will consist of telescopes of three different sizes, employing several different technologies for the cameras that detect the Cherenkov light from the observed air showers. In order to ensure the compliance of each camera technology with CTA requirements, CTA will perform central acceptance testing of each camera technology. To assist with this, the Camera Test Facilities (CTF) work package is developing a detailed test program covering the most important performance, stability, and durability requirements, including setting up the necessary equipment. Performance testing will include a wide range of tests like signal amplitude, time resolution, dead-time determination, trigger efficiency, performance testing under temperature and humidity variations and several others. These tests can be performed on fully-integrated cameras using a portable setup at the camera construction sites. In addition, two different setups for performance tests on camera sub-units are being built, which can provide early feedback for camera development. Stability and durability tests will include the long-term functionality of movable parts, water tightness of the camera housing, temperature and humidity cycling, resistance to vibrations during transport or due to possible earthquakes, UV-resistance of materials and several others. Some durability tests will need to be contracted out because they will need dedicated equipment not currently available within CTA. The planned test procedures and the current status of the test facilities will be presented.

Discussion (0). Continue with ORCID to comment.

Pith tools