pith. sign in

arxiv: 1803.05436 · v1 · pith:QTG2B2L5new · submitted 2018-03-14 · 🌌 astro-ph.HE · astro-ph.SR· hep-ph

Evidence for a New Component of High-Energy Solar Gamma-Ray Production

classification 🌌 astro-ph.HE astro-ph.SRhep-ph
keywords solarcomponentemissiongamma-rayminimumobserveddiskdominated
0
0 comments X
read the original abstract

The observed multi-GeV gamma-ray emission from the solar disk --- sourced by hadronic cosmic rays interacting with gas, and affected by complex magnetic fields --- is not understood. Utilizing an improved analysis of the Fermi-LAT data that includes the first resolved imaging of the disk, we find strong evidence that this emission is produced by two separate mechanisms. Between 2010-2017 (the rise to and fall from solar maximum), the gamma-ray emission is dominated by a polar component. Between 2008-2009 (solar minimum) this component remains present, but the total emission is instead dominated by a new equatorial component with a brighter flux and harder spectrum. Most strikingly, although 6 gamma rays above 100 GeV are observed during the 1.4 years of solar minimum, none are observed during the next 7.8 years. These features, along with a 30-50 GeV spectral dip which will be discussed in a companion paper, were not anticipated by theory. To understand the underlying physics, Fermi and HAWC observations of the imminent Cycle 25 solar minimum are crucial.

This paper has not been read by Pith yet.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.

Forward citations

Cited by 1 Pith paper

Reviewed papers in the Pith corpus that reference this work. Sorted by Pith novelty score.

  1. The Southern Wide-Field Gamma-Ray Observatory (SWGO): A Next-Generation Ground-Based Survey Instrument for VHE Gamma-Ray Astronomy

    astro-ph.IM 2019-07 unverdicted novelty 4.0

    SWGO is proposed as a wide-field VHE gamma-ray survey instrument with a compact inner detector array and sparser outer array, estimated at 54M USD construction cost and full operations by 2026.