Pith. sign in

REVIEW

Optimal Scheduling of an Isolated Microgrid with Battery Storage Considering Load and Renewable Generation Uncertainties

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 1808.05691 v1 pith:WBZZMXBC submitted 2018-08-16 eess.SP math.OC

classification eess.SPmath.OC
keywords constraintsisolatedmicrogridoptimalprogrammingproposedresultsscheduling
verification ladder T0 review T1 audit T2 compute T3 formal
0 comments
read the original abstract

By modeling the uncertainty of spinning reserves provided by energy storage with probabilistic constraints, a new optimal scheduling mode is proposed for minimizing the operating costs of an isolated microgrid (MG) by using chance-constrained programming. The model is transformed into a readily solvable mixed integer linear programming (MILP) formulation in GAMS via a proposed discretized step transformation (DST) approach and finally solved by applying the CPLEX solver. By properly setting the confidence levels of the spinning reserve probability constraints, the MG operation can be achieved a trade-off between reliability and economy. The test results on the modified ORNL DECC lab MG test system reveal that the proposal significantly exceeds the commonly used hybrid intelligent algorithm with much better and more stable optimization results and significantly reduced calculation times.

Discussion (0). Sign in to comment.

Pith tools