REVIEW 1 cited by
Improved Lower Bounds for Truthful Scheduling
Not yet reviewed by Pith; the record is open.
This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.
SPECIMEN: schema-true, not a live event
T0 review · schema-true
One-sentence machine reading of the paper's core claim.
pith:XXXXXXXX · record.json · timestamp
Signed reviews
abstract
The problem of scheduling unrelated machines by a truthful mechanism to minimize the makespan was introduced in the seminal "Algorithmic Mechanism Design" paper by Nisan and Ronen. Nisan and Ronen showed that there is a truthful mechanism that provides an approximation ratio of $\min(m,n)$, where $n$ is the number of machines and $m$ is the number of jobs. They also proved that no truthful mechanism can provide an approximation ratio better than $2$. Since then, the lower bound was improved to $1 +\sqrt 2 \approx 2.41$ by Christodoulou, Kotsoupias, and Vidali, and then to $1+\phi\approx 2.618$ by Kotsoupias and Vidali. Very recently, the lower bound was improved to $2.755$ by Giannakopoulos, Hammerl, and Pocas. In this paper we further improve the bound to $3-\delta$, for every constant $\delta>0$. Note that a gap between the upper bound and the lower bounds exists even when the number of machines and jobs is very small. In particular, the known $1+\sqrt{2}$ lower bound requires at least $3$ machines and $5$ jobs. In contrast, we show a lower bound of $2.2055$ that uses only $3$ machines and $3$ jobs and a lower bound of $1+\sqrt 2$ that uses only $3$ machines and $4$ jobs. For the case of two machines and two jobs we show a lower bound of $2$. Similar bounds for two machines and two jobs were known before but only via complex proofs that characterized all truthful mechanisms that provide a finite approximation ratio in this setting, whereas our new proof uses a simple and direct approach.
Forward citations
Cited by 1 Pith paper
-
Proportionally Fair Makespan Approximation
A proportional mechanism with payments achieves a tight 3/2 approximation to the optimal makespan in unrelated-machines scheduling, and achieves the exact optimum for normalized costs.
Discussion (0). Continue with ORCID to comment.