Pith. sign in

REVIEW

The New Small Wheel electronics

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 2303.12571 v2 pith:O2MHDN5N submitted 2023-03-22 hep-ex physics.ins-det

The New Small Wheel electronics

classification hep-ex physics.ins-det
keywords smallwheeldetectorelectronicsatlasboardsdatatechnologies
verification ladder T0 review T1 audit T2 compute T3 formal T4 reserved
0 comments
Share X Bluesky LinkedIn Reddit HN
read the original abstract

The increase in luminosity, and consequent higher backgrounds, of the LHC upgrades require improved rejection of fake tracks in the forward region of the ATLAS Muon Spectrometer. The New Small Wheel upgrade of the Muon Spectrometer aims to reduce the large background of fake triggers from track segments that are not originated from the interaction point. The New Small Wheel employs two detector technologies, the resistive strip Micromegas detectors and the "small" Thin Gap Chambers, with a total of 2.45 Million electrodes to be sensed. The two technologies require the design of a complex electronics system given that it consists of two different detector technologies and is required to provide both precision readout and a fast trigger. It will operate in a high background radiation region up to about 20 kHz/cm$^{2}$ at the expected HL-LHC luminosity of $\mathcal{L}$=7.5$\times10^{34}$cm$^{-2}$s$^{-1}$. The architecture of the system is strongly defined by the GBTx data aggregation ASIC, the newly-introduced FELIX data router and the software based data handler of the ATLAS detector. The electronics complex of this new detector was designed and developed in the last ten years and consists of multiple radiation tolerant Application Specific Integrated Circuits, multiple front-end boards, dense boards with FPGA's and purpose-built Trigger Processor boards within the ATCA standard. The New Small Wheel has been installed in 2021 and is undergoing integration within ATLAS for LHC Run 3. It should operate through the end of Run 4 (December 2032). In this manuscript, the overall design of the New Small Wheel electronics is presented.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.