Pith. sign in

REVIEW

CMS ECAL VFE design, production and testing

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 2311.02021 v1 pith:IWZU2TVX submitted 2023-11-03 physics.ins-det hep-ex

CMS ECAL VFE design, production and testing

classification physics.ins-det hep-ex
keywords cardsasicschannelsdesigndigitizeecalreliabilityrequired
verification ladder T0 review T1 audit T2 compute T3 formal T4 reserved
0 comments
Share X Bluesky LinkedIn Reddit HN
read the original abstract

Maintaining the required performance of the CMS electromagnetic calorimeter (ECAL) barrel at the High-Luminosity Large Hadron Collider (HL-LHC) requires the replacement of the entire on-detector electronics. 12240 new very front end (VFE) cards will amplify and digitize the signals of 62100 lead-tungstate crystals instrumented with avalanche photodiodes. The VFE cards host five channels of CATIA pre-amplifier ASICs followed by LiTE-DTU ASICs, which digitize signals with 160MS/s and 12bit resolution. We present the strategy and infrastructure developed for achieving the required reliability of less than 0.5% failing channels over the expected lifetime of 20 years. This includes the choice of standards, design for reliability and manufacturing, as well as factory acceptance tests, reception testing, environmental stress screening and calibration of the VFE cards.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.