Pith. sign in

REVIEW

An Exploratory Study on Just-in-Time Multi-Programming-Language Bug Prediction

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 2407.10906 v1 pith:ZQQFMUD7 submitted 2024-07-15 cs.SE

classification cs.SE
keywords predictionmplbmetricsmodelscross-projectdatasetfilesmultiple
verification ladder T0 review T1 audit T2 compute T3 formal
0 comments
read the original abstract

Context: An increasing number of software systems are written in multiple programming languages (PLs), which are called multi-programming-language (MPL) systems. MPL bugs (MPLBs) refers to the bugs whose resolution involves multiple PLs. Despite high complexity of MPLB resolution, there lacks MPLB prediction methods. Objective: This work aims to construct just-in-time (JIT) MPLB prediction models with selected prediction metrics, analyze the significance of the metrics, and then evaluate the performance of cross-project JIT MPLB prediction. Method: We develop JIT MPLB prediction models with the selected metrics using machine learning algorithms and evaluate the models in within-project and cross-project contexts with our constructed dataset based on 18 Apache MPL projects. Results: Random Forest is appropriate for JIT MPLB prediction. Changed LOC of all files, added LOC of all files, and the total number of lines of all files of the project currently are the most crucial metrics in JIT MPLB prediction. The prediction models can be simplified using a few top-ranked metrics. Training on the dataset from multiple projects can yield significantly higher AUC than training on the dataset from a single project for cross-project JIT MPLB prediction. Conclusions: JIT MPLB prediction models can be constructed with the selected set of metrics, which can be reduced to build simplified JIT MPLB prediction models, and cross-project JIT MPLB prediction is feasible.

Discussion (0). Sign in to comment.

Pith tools