REVIEW 2 cited by
A VLBI Calibrator Grid at 600MHz for Fast Radio Transient Localizations with CHIME/FRB Outriggers
Not yet reviewed by Pith; the record is open.
This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.
SPECIMEN: schema-true, not a live event
T0 review · schema-true
One-sentence machine reading of the paper's core claim.
pith:XXXXXXXX · record.json · timestamp
read the original abstract
The Canadian Hydrogen Intensity Mapping Experiment Fast Radio Burst (CHIME/FRB) Project has a new VLBI Outrigger at the Green Bank Observatory (GBO), which forms a 3300km baseline with CHIME operating at 400-800MHz. Using 100ms long full-array baseband "snapshots" collected commensally during FRB and pulsar triggers, we perform a shallow, wide-area VLBI survey covering a significant fraction of the Northern sky targeted at the positions of compact sources from the Radio Fundamental Catalog. In addition, our survey contains calibrators detected from two 1s long trial baseband snapshots for a deeper survey with CHIME and GBO. In this paper, we present the largest catalog of compact calibrators suitable for 30-milliarcsecond-scale VLBI observations at sub-GHz frequencies to date. Our catalog consists of 200 total calibrators in the Northern Hemisphere that are compact on 30-milliarcsecond scales with fluxes above 100mJy. This calibrator grid will enable the precise localization of hundreds of FRBs a year with CHIME/FRB-Outriggers.
Forward citations
Cited by 2 Pith papers
-
Discovery and Localization of the Swift-Observed FRB 20241228A in a Star-forming Host Galaxy
FRB 20241228A is localized to a star-forming galaxy at z=0.1614, with a stringent X-ray limit from Swift follow-up 112 seconds after the burst.
-
Overview of the Canadian Hydrogen Observatory and Radio Transient Detector (CHORD) Project
CHORD, a highly redundant 512×6 m dish wideband interferometer for 21 cm cosmology and FRBs, reports architecture, construction status, and three-dish commissioning results consistent with design targets.
Discussion (0). Sign in to comment.