First results of the new endcap TOF commissioning at BESIII
classification
⚛️ physics.ins-det
hep-ex
keywords
besiiicommissioningendcapetoffirstresultsbeencarried
read the original abstract
The upgrade of the current BESIII Endcap TOF (ETOF) is carried out with the Multi-gap Resistive Plate Chamber (MRPC) technology. The installation of the new ETOF has been finished in October 2015. The first results of the MRPCs commissioning at BESIII are reported in this paper.
This paper has not been read by Pith yet.
discussion (0)
Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.