Pith. sign in

REVIEW

Robust Generation Dispatch with Strategic Renewable Power Curtailment and Decision-Dependent Uncertainty

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 2203.16251 v2 pith:4BX77HN4 submitted 2022-03-30 math.OC cs.SYeess.SY

classification math.OCcs.SYeess.SY
keywords curtailmentgenerationpowerrenewablealgorithmscheduleuncertaintycontrollable
verification ladder T0 review T1 audit T2 compute T3 formal
0 comments
read the original abstract

As renewable energy sources replace traditional power sources (such as thermal generators), uncertainty grows while there are fewer controllable units. To reduce operational risks and avoid frequent real-time emergency controls, a preparatory schedule of renewable generation curtailment is required. This paper proposes a novel two-stage robust generation dispatch (RGD) model, where the preparatory curtailment schedule is optimized in the pre-dispatch stage. The curtailment schedule will then influence the variation range of real-time renewable power output, resulting in a decision-dependent uncertainty (DDU) set. In the re-dispatch stage, the controllable units adjust their outputs within the reserve capacities to maintain power balancing. To overcome the difficulty in solving the RGD with DDU, an adaptive column-and-constraint generation (AC\&CG) algorithm is developed. We prove that the proposed algorithm can generate the optimal solution in finite iterations. Numerical examples show the advantages of the proposed model and algorithm, and validate their practicability and scalability.

Discussion (0). Continue with ORCID to comment.

Pith tools