REVIEW
The DZERO Level 3 Data Acquistion System
Not yet reviewed by Pith; the record is open.
This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.
SPECIMEN: schema-true, not a live event
T0 review · schema-true
One-sentence machine reading of the paper's core claim.
pith:XXXXXXXX · record.json · timestamp
The DZERO Level 3 Data Acquistion System
read the original abstract
The DZERO experiment located at Fermilab has recently started RunII with an upgraded detector. The RunII physics program requires the Data Acquisition to readout the detector at a rate of 1 KHz. Events fragments, totaling 250 KB, are readout from approximately 60 front end crates and sent to a particular farm node for Level 3 Trigger processing. A scalable system, capable of complex event routing, has been designed and implemented based on commodity components: VMIC 7750 Single Board Computers for readout, a Cisco 6509 switch for data flow, and close to 100 Linux-based PCs for high-level event filtering.
discussion (0)
Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.