Sector Bounds for Vertical Cable Force Error in Cable-Suspended Load Transportation System

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 2304.00193 v1 pith:DQLYPY6J submitted 2023-04-01 cs.RO

Sector Bounds for Vertical Cable Force Error in Cable-Suspended Load Transportation System

classification cs.RO
keywords cabledisturbanceforcequadrotorsthrustuncertaintycable-suspendedestimate
verification ladder T0 review T1 audit T2 compute T3 formal T4 reserved
0 comments
read the original abstract

This article studies the collaborative transportation of a cable-suspended pipe by two quadrotors. A force-coordination control scheme is proposed, where a force-consensus term is introduced to average the load distribution between the quadrotors. Since thrust uncertainty and cable force are coupled together in the acceleration channel, disturbance observer can only obtain the lumped disturbance estimate. Under the quasi-static condition, a disturbance separation strategy is developed to remove the thrust uncertainty estimate for precise cable force estimation. The stability of the overall system is analyzed using Lyapunov theory. Both numerical simulations and indoor experiments using heterogeneous quadrotors validate the effectiveness of thrust uncertainty separation and force-consensus algorithm.