Scheduling Post-Disaster Repairs in Electricity Distribution Networks

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 1702.08382 v2 pith:J55DDAOG submitted 2017-02-27 math.OC

classification math.OC
keywords schedulingdistributionproblemrepairalgorithmalgorithmselectricityfirst
verification ladder T0 review T1 audit T2 compute T3 formal
0 comments
abstract

Natural disasters, such as hurricanes, earthquakes and large wind or ice storms, typically require the repair of a large number of components in electricity distribution networks. Since power cannot be restored before these repairs have been completed, optimally scheduling the available crews to minimize the cumulative duration of the customer interruptions reduces the harm done to the affected community. Considering the radial network structure of the distribution system, this repair and restoration process can be modeled as a scheduling problem with soft precedence constraints. As a benchmark, we first formulate this problem as a time-indexed ILP with valid inequalities. Three practical methods are then proposed to solve the problem: (i) an LP-based list scheduling algorithm, (ii) a single to multi-crew repair schedule conversion algorithm, and (iii) a dispatch rule based on $\rho$-factors which can be interpreted as Component Importance Measures. We show that the first two algorithms are $2$ and $\left(2 - \frac{1}{m}\right)$ approximations respectively. We also prove that the latter two algorithms are equivalent. Numerical results validate the effectiveness of the proposed methods.