Pith. sign in

REVIEW

Approximation algorithms for two-machine flow-shop scheduling with a conflict graph

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 1803.02862 v1 pith:JPQ7DTDG submitted 2018-03-07 cs.DS

Approximation algorithms for two-machine flow-shop scheduling with a conflict graph

classification cs.DS
keywords graphconflictjobsnumberpathsproblemalgorithmapproximation
verification ladder T0 review T1 audit T2 compute T3 formal T4 reserved
0 comments
read the original abstract

Path cover is a well-known intractable problem that finds a minimum number of vertex disjoint paths in a given graph to cover all the vertices. We show that a variant, where the objective function is not the number of paths but the number of length-$0$ paths (that is, isolated vertices), turns out to be polynomial-time solvable. We further show that another variant, where the objective function is the total number of length-$0$ and length-$1$ paths, is also polynomial-time solvable. Both variants find applications in approximating the two-machine flow-shop scheduling problem in which job processing has constraints that are formulated as a conflict graph. For the unit jobs, we present a $4/3$-approximation algorithm for the scheduling problem with an arbitrary conflict graph, based on the exact algorithm for the variants of the path cover problem. For the arbitrary jobs while the conflict graph is the union of two disjoint cliques, that is, all the jobs can be partitioned into two groups such that the jobs in a group are pairwise conflicting, we present a simple $3/2$-approximation algorithm.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.