pith. sign in

arxiv: 1809.01006 · v1 · pith:P6QVPMVAnew · submitted 2018-08-31 · ⚛️ physics.ins-det · physics.data-an

Matching problem for primary and secondary signals in dual-phase TPC detectors

classification ⚛️ physics.ins-det physics.data-an
keywords matchingproblemsecondarysignalsdetectorsdual-phaselightprimary
0
0 comments X
read the original abstract

The problem of matching primary and secondary light signals, belonging to the same event, is presented in the context of dual-phase time projection chambers. In large-scale detectors, the secondary light emission could be delayed up to order of milliseconds, which, combined with high signal rates, could make the matching of the signals challenging. A possible approach is offered in the framework of the Stable Marriage and the College Admission problem, for both of which solutions are given by the Gale-Shapley algorithm.

This paper has not been read by Pith yet.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.