Experimental Investigation of Control Updating Period Monitoring In Industrial PLC-based Fast MPC: Application to The Constrained Control of a Cryogenic Refrigerator
read the original abstract
In this paper, a complete industrial validation of a recently published scheme for on-line adaptation of the control updating period in Model Predictive Control is proposed. The industrial process that serves in the validation is a cryogenic refrigerator that is used to cool the supra-conductors involved in particle accelerators or experimental nuclear reactors. Two recently predicted features are validated: the first states that it is sometimes better to use less efficient (per iteration) optimizer if the lack of efficiency is over-compensated by an increase in the updating control frequency. The second is that for a given solver, it is worth monitoring the control updating period based on the on-line measured behavior of the cost function.
This paper has not been read by Pith yet.
discussion (0)
Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.