Pith. sign in

Paper Citation Record · LEDGER

Optimizing rake-links independently of timetables in railway operations

As of 8 August 2026, this Paper Citation Record lists 9 of 9 outbound references and 0 inbound Pith citation observations for arXiv:2506.07024.

A citation records a reference. It does not transfer a finding from one paper to another.

pith.paper-citation-record.v1
2506.07024 v1

Coverage vector

measured 9 of 9 reference resolution

Typed states for the displayed outbound observations.

Source: paper_references, paper_reference_links, observed 2026-08-07T05:49:53.290686Z

measured 9 of 9 standing notices

One-hop event checks from named stored sources.

Source: scholarly_work_events, retraction_status_cache, observed 2026-08-07T06:34:17.273281+00:00

measured 0 of 0 inbound itemization

Pith citing papers itemized under the disclosed page cap.

Source: paper_references, paper_reference_links

measured 0 of 1 external citation measurements

A source-named dated measurement, never combined with another source.

Source: cited_works

Reference resolution

9 of 9 outbound references displayed

  • verified exact0
  • verified fuzzy9
  • unresolved0
  • parse uncertain0
  • malformed identifier0
  • metadata mismatch0

External citation measurements

No source-named external measurement is stored.

Outbound references

Observation c783e6ee-2fed-46fd-8e38-854ec8d1b79d · outbound

This paper cites Simultaneous assign- ment of locomotives and cars to passenger trains.

Optimizing rake-links independently of timetables in railway operations Simultaneous assign- ment of locomotives and cars to passenger trains

Reference 1

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T05:49:53.396050Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.

source=pdf_text observed=2026-08-07T05:49:53.260911Z digest=sha256:aea91aa03563f25bbab26b1e1543640d33164cce96dbb5224f363c692532a801

Observation 854ae5b8-d3e2-45f7-8456-7d30bdb7abd5 · outbound

This paper cites A branch- first, cut-second approach for locomotive assignment.

Optimizing rake-links independently of timetables in railway operations A branch- first, cut-second approach for locomotive assignment

Reference 2

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T05:49:53.386820Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.

source=pdf_text observed=2026-08-07T05:49:53.265337Z digest=sha256:13f0a15d45a9552c930573153dcab0609d9aa51209230bb9150dc2755e1af47c

Observation dfc6fc9e-e94f-4148-912a-3920af0124e7 · outbound

This paper cites A pragmatic opti- mization method for motor train set assignment and maintenance scheduling problem.

Optimizing rake-links independently of timetables in railway operations A pragmatic opti- mization method for motor train set assignment and maintenance scheduling problem

Reference 3

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T05:49:53.377861Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.

source=pdf_text observed=2026-08-07T05:49:53.268909Z digest=sha256:44210449ca962148685631bd073373fdf8aa2b185439a565772cc4f91b9cb8fe

Observation d067950a-ac33-4981-a263-d378e622744c · outbound

This paper cites Rake linking for suburban train services.

Optimizing rake-links independently of timetables in railway operations Rake linking for suburban train services

Reference 4

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T05:49:53.368396Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.

source=pdf_text observed=2026-08-07T05:49:53.272397Z digest=sha256:fcf761d034b94e445a63f5ce77144228cadfe25b5c0bbc6b8a5ab6f538639060

Observation 0188e129-4f90-405f-b588-2dc0fcd9aea3 · outbound

This paper cites Indian railways: Train set assignment problem in suburban services.

Optimizing rake-links independently of timetables in railway operations Indian railways: Train set assignment problem in suburban services

Reference 5

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T05:49:53.358675Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.

source=pdf_text observed=2026-08-07T05:49:53.275545Z digest=sha256:1241796fe4dae3d39908e5bf40018c613f0d36ced04802dd0e9b8f978457e162

Observation 9ce8b2fd-c04d-47e1-833c-c5c7ad395e6c · outbound

This paper cites A pragmatic algo- rithm for the train-set routing: the case of korea high-speed railway.

Optimizing rake-links independently of timetables in railway operations A pragmatic algo- rithm for the train-set routing: the case of korea high-speed railway

Reference 6

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T05:49:53.348815Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.

source=pdf_text observed=2026-08-07T05:49:53.278811Z digest=sha256:b29ac6e97f8b92c86a775c33f477cac61c41dd60a23b70c32ca3ff340e09b984

Observation 2cf65686-2ff7-4c0c-92e2-5f53c80dffe6 · outbound

This paper cites A multi- objective train scheduling model and solution.

Optimizing rake-links independently of timetables in railway operations A multi- objective train scheduling model and solution

Reference 7

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T05:49:53.339482Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.

source=pdf_text observed=2026-08-07T05:49:53.283592Z digest=sha256:1ce377e04936cecdf04c0ce8ed178984181d00ef9012eb95c03b87a579d96d29

Observation 6f9af30f-3ec9-4065-bbc6-8d1ecbf5d78e · outbound

This paper cites Passenger railway optimization.

Optimizing rake-links independently of timetables in railway operations Passenger railway optimization

Reference 8

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T05:49:53.329850Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.

source=pdf_text observed=2026-08-07T05:49:53.287533Z digest=sha256:1fae41995335c5b0a7169fc924bc086d9f82051fe3c74ea04f3395855fb98303

Observation 0a943af4-c904-4ed1-aeba-f7208bd40283 · outbound

This paper cites Literature review on problem models and solution approaches for managing real-time passenger train operations: The perspective of train operating companies.

Optimizing rake-links independently of timetables in railway operations Literature review on problem models and solution approaches for managing real-time passenger train operations: The perspective of train operating companies

Reference 9

Resolution
verified fuzzy
raw_fallback, observed 2026-08-07T05:49:53.318516Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.

source=pdf_text observed=2026-08-07T05:49:53.290686Z digest=sha256:28fb8935428162f7988345329de31150b4e208692dcc94cc509ffa5ed4bb5cfa

Pith citing papers

No inbound Pith citation observations are available.