REVIEW 1 cited by
Capacity Credit Evaluation of Generalized Energy Storage Considering Strategic Capacity Withholding and Decision-Dependent Uncertainty
Not yet reviewed by Pith; the record is open.
This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.
SPECIMEN: schema-true, not a live event
T0 review · schema-true
One-sentence machine reading of the paper's core claim.
pith:XXXXXXXX · record.json · timestamp
Capacity Credit Evaluation of Generalized Energy Storage Considering Strategic Capacity Withholding and Decision-Dependent Uncertainty
read the original abstract
This paper proposes a novel capacity credit evaluation framework to accurately quantify the contribution of generalized energy storage (GES) to resource adequacy, considering both strategic capacity withholding and decision-dependent uncertainty (DDU). To this end, we establish a market-oriented risk-averse coordinated dispatch method to capture the cross-market reliable operation of GES. The proposed method is sequentially implemented along with the Monte Carlo simulation process, coordinating the pre-dispatched price arbitrage and capacity withholding in the energy market with adequacy-oriented re-dispatch during capacity market calls. In addition to decision-independent uncertainties in operational states and baseline behavior, we explicitly address the inherent DDU of GES (i.e., the uncertainty of available discharge capacity affected by the incentives and accumulated discomfort) during the re-dispatch stage using the proposed data-driven distributional robust chance-constrained approach. Furthermore, a capacity credit metric called equivalent storage capacity substitution is introduced to quantify the equivalent deterministic storage capacity of uncertain GES. Simulations on the modified IEEE RTS-79 benchmark system with 20 years real-world data from Elia demonstrate that the proposed method yields accurate capacity credit and improved economic performance. We show that the capacity credit of GES increases with more strategic capacity withholding but decreases with more DDU levels. Key factors, such as capacity withholding and DDU structure impacting GES's capacity credit are analyzed with insights into capacity market decision-making.
Forward citations
Cited by 1 Pith paper
-
Reformulating Energy Storage Capacity Accreditation Problem with Marginal Reliability Impact
Storage MRI can be read from dual variables of a reliability-dispatch optimization; EUE is piecewise linear and storage MRI is non-negative.
discussion (0)
Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.