pith. sign in

arxiv: 2302.10566 · v1 · pith:UX7RP7TBnew · submitted 2023-02-21 · 🌌 astro-ph.IM

The commissioning phase

classification 🌌 astro-ph.IM
keywords telescopecommissioningfirstmountedalreadyfirst-lightnasmythoptics
0
0 comments X
read the original abstract

In May 1997 a consistent part of the services and structures committed to the industry had already been released to the commissioning group. The telescope itself was, with the exception of the Nasmyth derotators, motors and all the optics groups, basically ready in its mechanical parts to accept the integration of all services and control equipment. Also the verification of the cabling (interlocks, data-nets, power and controls) already mounted was started in the same period. Starting from June 1998 (telescope first-light date) the telescope went gradually in use, several nights per week, in order to test and tune the tracking and pointing system, the optics and the first derotator system (Nasmyth A station). At the end of the commissioning period and with the first scientific instruments mounted (April 1999) also the first routinely observations started. In this moment the telescope is doing astronomy 80% of time and the complete first-light instrumentation is mounted.

This paper has not been read by Pith yet.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.